Groundwater Development Project Package No. 3
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project includes furnishing all labor, materials, and equipment necessary for the demolition of an existing 2.2-million gallon reservoir, new 1.9-million gallon prestressed reservoir, 4.3 mgd Water Treatment Plant (WTP) which includes filter units for iron and manganese removal, an 800 hp deep well pump, an onsite sodium hypochlorite generation and metering system, a CMU block building, electr
- Status
- Closed
- Sector
- Commercial, Metal, Water Supply and Storage, Power Generation (CCGT), Government, Steel, Waste Processing and Treatment
- Location
- Portland, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Groundwater Development Project Package No. 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes furnishing all labor, materials, and equipment necessary for the demolition of an existing 2.2-million gallon reservoir, new 1.9-million gallon prestressed reservoir, 4.3 mgd Water Treatment Plant (WTP) which includes filter units for iron and manganese removal, an 800 hp deep well pump, an onsite sodium hypochlorite generation and metering system, a CMU block building, electrical, HVAC, and plumbing; upgrading an existing finished water pump station to 4.3 mgd capacity, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Portland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Water Supply and Storage, Power Generation (CCGT), Government, Steel, Waste Processing and Treatment |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
