logo

Groundwater Recharge Basin Improvements REBID

Sector: Water Supply and Storage • Location: Turlock, California, United States of America

Source: Dodge USA

Project
Closed

Groundwater Recharge Station Project, Project Number 21-381 (REPOST) In general, the work consists of demolition, including excavation and removal of existing landscape, to accommodate a groundwater recharge basin and installation of pump system that shall be connect to existing discharge pipe with bypass option. New controls shall be connected to the University s existing system in accordance wit

Status
Closed
Sector
Water Supply and Storage, Education, Waste Processing and Treatment, Commercial
Location
Turlock, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Groundwater Recharge Basin Improvements REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Groundwater Recharge Basin Improvements REBID” is an infrastructure initiative in the Water Supply and Storage sector, located in Turlock, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Groundwater Recharge Station Project, Project Number 21-381 (REPOST) In general, the work consists of demolition, including excavation and removal of existing landscape, to accommodate a groundwater recharge basin and installation of pump system that shall be connect to existing discharge pipe with bypass option. New controls shall be connected to the University s existing system in accordance with the plans and specifications

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Turlock

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Education, Waste Processing and Treatment, Commercial

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project