logo

Groundwater Supply System Improvements to Mitigate Impacts of Extreme Weather Events on Lake Based Supplies

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
In Progress

The project proposes to upgrade the water supply, treatment and storage of drinking water in the northern York Region. Water to these communities is sourced from a lake-based supply, which is at risk of failure due to extreme storm events and extreme heat events. The project will mitigate the risk through diversification of water sources, in this case with investment in a resilient and sustainable

Project Information FAQ

Project Information

4 Q
The project “Groundwater Supply System Improvements to Mitigate Impacts of Extreme Weather Events on Lake Based Supplies” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project proposes to upgrade the water supply, treatment and storage of drinking water in the northern York Region. Water to these communities is sourced from a lake-based supply, which is at risk of failure due to extreme storm events and extreme heat events. The project will mitigate the risk through diversification of water sources, in this case with investment in a resilient and sustainable groundwater supply system consisting of 11 wellfield sites and 23 wells (i.e., multiple wells are located at each wellfield site). The groundwater wells included in this project are located within the 4 communities they serve. This project would begin construction in 2023 and end in 2028.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data