Groundwater Well Upgrades
Sector: Commercial • Location: Salley, South Carolina, United States of America
Source: Dodge USA
The Project consists of the following major elements: Well No. 1, Town Hall Well, demo existing well/chemical building, well head piping and other miscellaneous items, chemical clean existing well, pump test, install well pump, drop piping, well head piping, chemical feed fiberglass building with chemical metering pumps and tanks, chemical storage fiberglass building, electrical, reinstallation of
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Car parking, Government, Automotive, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Salley, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Groundwater Well Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the following major elements: Well No. 1, Town Hall Well, demo existing well/chemical building, well head piping and other miscellaneous items, chemical clean existing well, pump test, install well pump, drop piping, well head piping, chemical feed fiberglass building with chemical metering pumps and tanks, chemical storage fiberglass building, electrical, reinstallation of existing instrumentation/SCADA and other related items. Well No. 2, Elevated Tank/Park Well, dem... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Salley |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Car parking, Government, Automotive, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2023-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
