Grove Hotel
Start · Idaho · Last reported Dec 2024
Source: Dodge USA
Grove Hotel - Pip(Grove Hotel) Permit Is To Remodel The Interior Of The Existing Hotel From The Arena Level To The 13Th Floor. The Work Is Required To Comply With The Approved Drawings, With The Plan Review Report, And With All Applicable Codes And Ordinances. Work To Include: Event Level Locker Room And Shower Improvements, Vestibules And Restrooms In Lobby Improvements, Elevator Corridors Improv
- Status
- Prospective
- Sector
- Residential, Government, Stadium, Hotel, Commercial, Manufacturing (Industrial)
- Location
- Boise, Idaho, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Grove Hotel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Grove Hotel - Pip(Grove Hotel) Permit Is To Remodel The Interior Of The Existing Hotel From The Arena Level To The 13Th Floor. The Work Is Required To Comply With The Approved Drawings, With The Plan Review Report, And With All Applicable Codes And Ordinances. Work To Include: Event Level Locker Room And Shower Improvements, Vestibules And Restrooms In Lobby Improvements, Elevator Corridors Improvements, 2Nd And 3Rd Floor Meeting Rooms And Corridors Improvements, 4Th Floor Office Improvements... |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Boise |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Residential, Government, Stadium, Hotel, Commercial, Manufacturing (Industrial) |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- CR 347/ DAVID'S HOME CHURCH RD @ SCULL SHOAL CREEK
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
