GrowTEC Biogas Facility Expansion
One of 10,000+ projects Taiyo tracks in Alberta.
Source: Dodge
Phase 2 expansion of the Grow the Energy Circle (GrowTEC) biogas facility to increase renewable natural gas production capacity to up to 120,000 gigajoules annually. The project includes installing preprocessing and depackaging equipment to address bottlenecks and enhancing the RNG upgrading system.
- Status
- Prospective
- Sector
- Oil and Gas, Natural Gas, Biomass, Commercial, Chemical (Industrial), Manufacturing (Industrial)
- Location
- Lethbridge, Alberta, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about GrowTEC Biogas Facility Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Phase 2 expansion of the Grow the Energy Circle (GrowTEC) biogas facility to increase renewable natural gas production capacity to up to 120,000 gigajoules annually. The project includes installing preprocessing and depackaging equipment to address bottlenecks and enhancing the RNG upgrading system. |
Budget |
Location
Country | Canada |
State | Alberta |
City | Lethbridge |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Natural Gas, Biomass, Commercial, Chemical (Industrial), Manufacturing (Industrial) |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
