logo

Grundartangi Line 2 Restart Project

Sector: Metal • Location: Grundartangi, Iceland

Source: The Globe and Mail

Project
Under Construction

Restart of Potline 2 at the Grundartangi aluminum smelter in Iceland, with full restoration targeted by the end of July 2026. The plant will operate at reduced amperage pending transformer installation in Q4 2026.

Status
Under Construction
Sector
Metal, Manufacturing (Industrial), Steel
Location
Grundartangi, Iceland
Updated
22 Jul 2026
Source
The Globe and Mail

ConstructChat

Ask ConstructChat about Grundartangi Line 2 Restart Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Grundartangi Line 2 Restart Project” is an infrastructure initiative in the Metal sector, located in Grundartangi, Iceland. Taiyo aggregates data on it from The Globe and Mail.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Restart of Potline 2 at the Grundartangi aluminum smelter in Iceland, with full restoration targeted by the end of July 2026. The plant will operate at reduced amperage pending transformer installation in Q4 2026.

Original sector

Industrial

Location

Country

Iceland

City

Grundartangi

Source

Source

The Globe and Mail

URL

More Details

Record type

Project

Sector

Metal, Manufacturing (Industrial), Steel

Article published date

2026-05-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project