logo

Grupo T Arequipa Solar Plant

Sector: Commercial • Location: Kansas, Peru

Source: World Bank Group

Project
Active

Majes Solar S.A.C. was created to build, own and operate a 20 MW solar project in the rural Arequipa region of southwestern Peru. In 2011, The project company was a joint venture between 3 sponsors: the Spanish firms Grupo T solar and Solarpack, and the U.S. based Assured guaranty Ltd.

The project would sell power to the SEIN grid system and had obtained through tender a 20 year PPA to sell powe

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Solar, Government
Location
Kansas, Peru
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Grupo T Arequipa Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Grupo T Arequipa Solar Plant” is an infrastructure initiative in the Commercial sector, located in Kansas, Peru. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Majes Solar S.A.C. was created to build, own and operate a 20 MW solar project in the rural Arequipa region of southwestern Peru. In 2011, The project company was a joint venture between 3 sponsors: the Spanish firms Grupo T solar and Solarpack, and the U.S. based Assured guaranty Ltd. The project would sell power to the SEIN grid system and had obtained through tender a 20 year PPA to sell power from the Peruvian Ministry of Mines and Energy. Total project investment was scheduled to be USD 87.3 million, with 61.5 million in loan financing from OPIC. The loan would have a 19-year term including a 2-year grace period and a 17-year repayment period. The OPIC loan was to have an averagelife of approximately 12 years. The tenor of the OPIC loan provides for a 2-year tail from the expected maturity date of the OPIC loan to the end of the Project’s power purchase agreements. Expected commissioning was for 2012.

Original sector

Energy

Budget

Location

Country

Peru

State

Kansas

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Solar, Government

Article published date

2024-05-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project