GRWD North Booster Station Construction
Sector: Waste Processing and Treatment • Location: Garrison, North Dakota, United States of America
Source: Dodge
Generally, the Work covered by the Plans and Specifications includes the construction of a water booster station featuring a wood framed building with metal panel exterior, FRP interior wall covering, electrical, HVAC, process piping, pump controls, and all related accessories. Underground utilities include approximately 102 LF of 4-inch PVC watermain piping, gate valves, and 42 LF of 18" CMP culv
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Metal, Power Generation (CCGT), Commercial, Government
- Location
- Garrison, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about GRWD North Booster Station Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Generally, the Work covered by the Plans and Specifications includes the construction of a water booster station featuring a wood framed building with metal panel exterior, FRP interior wall covering, electrical, HVAC, process piping, pump controls, and all related accessories. Underground utilities include approximately 102 LF of 4-inch PVC watermain piping, gate valves, and 42 LF of 18" CMP culverts. Demolition and removal of existing above ground water booster station and below grade preca... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Garrison |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Metal, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
