GTA Phase 1 LNG Project
One of 1,223 projects Taiyo tracks in Mauritania.
Source: Asianet Newsable
The Greater Tortue Ahmeyim (GTA) Phase 1 project is a liquefied natural gas (LNG) initiative that has begun gas flow from wells to a floating production storage and offloading (FPSO) vessel. Once fully commissioned, it is expected to produce around 2.3 million tonnes of LNG annually.
- Status
- Under Construction
- Sector
- LNG, Seaport, Natural Gas
- Location
- Mauritania
- Updated
- 22 Jul 2026
- Source
- Asianet Newsable
ConstructChat
Ask ConstructChat about GTA Phase 1 LNG Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Greater Tortue Ahmeyim (GTA) Phase 1 project is a liquefied natural gas (LNG) initiative that has begun gas flow from wells to a floating production storage and offloading (FPSO) vessel. Once fully commissioned, it is expected to produce around 2.3 million tonnes of LNG annually. |
Original sector | Energy |
Location
Country | Mauritania |
Source
Source | Asianet Newsable |
URL |
More Details
Record type | Project |
Sector | LNG, Seaport, Natural Gas |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
