logo

GTCC Power Station at Alba Plant

Sector: Power Generation (CCGT) • Location: Bahrain

Source: ZAWYA

Project
Completed

Mitsubishi Power has successfully completed the Power Station 5 Block 4 gas turbine combined cycle (GTCC) power plant at Aluminium Bahrain (Alba). This high-efficiency power plant is powered by Mitsubishi Power's hydrogen-ready M701JAC gas turbine and steam turbine, contributing to Alba's decarbonization goals and energy security.

Status
Closed
Sector
Power Generation (CCGT), Hydrogen, Wind
Location
Bahrain
Updated
22 Jul 2026
Source
ZAWYA

ConstructChat

Ask ConstructChat about GTCC Power Station at Alba Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “GTCC Power Station at Alba Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bahrain. Taiyo aggregates data on it from ZAWYA.

Participants

Company

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Mitsubishi Power has successfully completed the Power Station 5 Block 4 gas turbine combined cycle (GTCC) power plant at Aluminium Bahrain (Alba). This high-efficiency power plant is powered by Mitsubishi Power's hydrogen-ready M701JAC gas turbine and steam turbine, contributing to Alba's decarbonization goals and energy security.

Original sector

Energy

Location

Country

Bahrain

Source

Source

ZAWYA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydrogen, Wind

Article published date

2025-02-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project