logo

GUADALUPE POWER

Sector: Water Supply and Storage • Location: Colombia

Source: World Bank Group

Project
Closed

The Guadalupe Hydroelectric Project for Colombia will provide a loan of US $12 million to the Empresas Publicas de Medellin (EPM) to finance its power expansion program. The EPM owns and operates the electrical power supply in the area of Medellin. Currently, it does not have the capacity to supply enough power to its consumers. This problem has slowed economic development in the area. The objecti

Project Information FAQ

Project Information

5 Q
The project “GUADALUPE POWER” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Guadalupe Hydroelectric Project for Colombia will provide a loan of US $12 million to the Empresas Publicas de Medellin (EPM) to finance its power expansion program. The EPM owns and operates the electrical power supply in the area of Medellin. Currently, it does not have the capacity to supply enough power to its consumers. This problem has slowed economic development in the area. The objective of the project is to increase the generating capacity of the EPM by 96 MW and the amount of energy delivered annually to Medellin by 540 million kwh. It will include transmission facilities and the expansion of the distribution system in Medellin. The project components are: 1) diversion of two small rivers into the Guadalupe river; 2) construction of the Troneras earth filled dam; 3) construction of the Troneras and Guadalupe III power plants; 4) installation of 70 km of double circuit 120 kv transmission and tie lines; 5) enlargement of Medellin substations, addition of transformer capacity, and extension of primary and secondary distribution circuits; and 6) preliminary studies on the Nare scheme. These improvements will increase the power capacity of the EPM in order to meet consumer demands.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data