logo
ProjectClosed

GUADALUPE POWER

Sector: Water Supply and Storage • Location: Colombia

Source: World Bank Group

The Guadalupe Hydroelectric Project for Colombia will provide a loan of US $12 million to the Empresas Publicas de Medellin (EPM) to finance its power expansion program. The EPM owns and operates the electrical power supply in the area of Medellin. Currently, it does not have the capacity to supply enough power to its consumers. This problem has slowed economic development in the area. The objecti

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Government
Location
Colombia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about GUADALUPE POWER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “GUADALUPE POWER” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Guadalupe Hydroelectric Project for Colombia will provide a loan of US $12 million to the Empresas Publicas de Medellin (EPM) to finance its power expansion program. The EPM owns and operates the electrical power supply in the area of Medellin. Currently, it does not have the capacity to supply enough power to its consumers. This problem has slowed economic development in the area. The objective of the project is to increase the generating capacity of the EPM by 96 MW and the amount of energy delivered annually to Medellin by 540 million kwh. It will include transmission facilities and the expansion of the distribution system in Medellin. The project components are: 1) diversion of two small rivers into the Guadalupe river; 2) construction of the Troneras earth filled dam; 3) construction of the Troneras and Guadalupe III power plants; 4) installation of 70 km of double circuit 120 kv transmission and tie lines; 5) enlargement of Medellin substations, addition of transformer capacity, and extension of primary and secondary distribution circuits; and 6) preliminary studies on the Nare scheme. These improvements will increase the power capacity of the EPM in order to meet consumer demands.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Colombia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project