GUADALUPE POWER
Sector: Water Supply and Storage • Location: Colombia
Source: World Bank Group
The Guadalupe Hydroelectric Project for Colombia will provide a loan of US $12 million to the Empresas Publicas de Medellin (EPM) to finance its power expansion program. The EPM owns and operates the electrical power supply in the area of Medellin. Currently, it does not have the capacity to supply enough power to its consumers. This problem has slowed economic development in the area. The objecti
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- Colombia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about GUADALUPE POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Guadalupe Hydroelectric Project for Colombia will provide a loan of US $12 million to the Empresas Publicas de Medellin (EPM) to finance its power expansion program. The EPM owns and operates the electrical power supply in the area of Medellin. Currently, it does not have the capacity to supply enough power to its consumers. This problem has slowed economic development in the area. The objective of the project is to increase the generating capacity of the EPM by 96 MW and the amount of energy delivered annually to Medellin by 540 million kwh. It will include transmission facilities and the expansion of the distribution system in Medellin. The project components are: 1) diversion of two small rivers into the Guadalupe river; 2) construction of the Troneras earth filled dam; 3) construction of the Troneras and Guadalupe III power plants; 4) installation of 70 km of double circuit 120 kv transmission and tie lines; 5) enlargement of Medellin substations, addition of transformer capacity, and extension of primary and secondary distribution circuits; and 6) preliminary studies on the Nare scheme. These improvements will increase the power capacity of the EPM in order to meet consumer demands. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Colombia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
