Guaira Thermal Power Plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Brazilian company Central Energetica Guaira Ltda, a wholly-owned subsidiary of Usina Acucareira Guaira Ltda, was granted an authorization by the regulatory agency ANEEL to build a 55-MW thermal power plant located in the state of São Paulo (municipality of Guaira). The cogeneration power plant was set to use sugar cane residues resulting from the ethanol producing unit belonging to the same co
- Status
- Prospective
- Sector
- Geothermal, Power Generation (CCGT), Government, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Guaira Thermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Brazilian company Central Energetica Guaira Ltda, a wholly-owned subsidiary of Usina Acucareira Guaira Ltda, was granted an authorization by the regulatory agency ANEEL to build a 55-MW thermal power plant located in the state of São Paulo (municipality of Guaira). The cogeneration power plant was set to use sugar cane residues resulting from the ethanol producing unit belonging to the same company as fuel. In January 2009, Central Energetica Guaira signed a 30-year contract with ANEEL allowing the company to operate in the electricity market as a independent producer. This authorization granted the sponsor with the right to sell electricity in the Brazilian wholesale market. In August 2009, the company had taken part in a competitive bidding process to sell electricity to the regulated wholesale market (15-year power purchase agreement was signed guaranteeing the sale of electricity to the national grid). Of the 55 MW of electricity to be produced, 15 MW would be set aside for the ethanol producing unit consumption, while 25 MW was the capacity committed to the referred power purchase agreement. Central Energetica Guaira Ltda committed to invest US$ 50 million (BRL 100 million). In April 2009, the company was granted a US$ 40 million (BRL 80.00 million) loan contract from BNDES, a state-owned development bank. Construction works on this plant started in 2009, and the unit became operational in June 2010. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project