logo

Guajiru Wind Farm

Sector: Wind • Location: Brazil

Source: World Bank Group

Project
Active

The project entails the construction of the 21 MW Guajiru Wind Farm part of the Cutia Wind Complex. SPV is UEE Guajiru S.A., a wholly owned subsidiary of the sponsor Copel that covers 69 % of the total cost ($ 23.13 million) while the rest ($ 10.4 million) is provided as debt by BNDES. The concession period is 28 years and was awarded to the company at the 6th LER auction in Brazil. Financial clos

Status
Prospective
Sector
Wind, Power Generation (CCGT), Raw Materials, Commercial, Warehouse, Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Guajiru Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Guajiru Wind Farm” is an infrastructure initiative in the Wind sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of the 21 MW Guajiru Wind Farm part of the Cutia Wind Complex. SPV is UEE Guajiru S.A., a wholly owned subsidiary of the sponsor Copel that covers 69 % of the total cost ($ 23.13 million) while the rest ($ 10.4 million) is provided as debt by BNDES. The concession period is 28 years and was awarded to the company at the 6th LER auction in Brazil. Financial close took place on September 28, 2018. https://www.terra.com.br/economia/copel-bndes-aprova-financiamento-para-empreendimento-eolico-cutia,5c93b5a8acc20479b9494fbe5496bc67hpuhf5g8.html https://sec.report/Document/0001292814-18-001238

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Raw Materials, Commercial, Warehouse, Government

Article published date

2024-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project