Guangdong Huaiji Power
One of 748 projects Taiyo tracks in Guangdong.
Source: World Bank Group
In January 1999, China Light and Power Ltd. (CLP) had finalized the Guangdong Huaiji Hydro-electric Power Project, which involved a 30-year BOT contract to build, own and operate of 9 small scale power stations with a total installed capacity of 98 MW in Huaiji County in northwestern Guangdong Province.
The total cost of the project is US$115.7 million (HK$900 million). CLP owned 41.5% of the
- Status
- Prospective
- Sector
- Commercial, Government, Hydro, Power Generation (CCGT)
- Location
- Guangdong, China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Guangdong Huaiji Power
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In January 1999, China Light and Power Ltd. (CLP) had finalized the Guangdong Huaiji Hydro-electric Power Project, which involved a 30-year BOT contract to build, own and operate of 9 small scale power stations with a total installed capacity of 98 MW in Huaiji County in northwestern Guangdong Province. The total cost of the project is US$115.7 million (HK$900 million). CLP owned 41.5% of the scheme through subsidiary, CLP Hydro Power Ltd., while Sun Huang Kai China Development Fund Ltd., a subsidiary of Sun Huang Kai of Hong Kong,, owned 8.5%. The remaining 50% stake was held by Huaiji County Huilian Hydro-electric (group) Co., Ltd. The electricity that is generated was to be sold to the power grids of Huaiji and Guangdong Province. In June 2005, CLP completed the buy-out of Sun Hung Kai China Development Fund Limited's interest in Huajji. The government of Zhaoqing City in Guangdong had approved the restructuring of Huaiji's shareholding and CLP's interest in Huaiji increased to 75%. The Huaiji County Huilian Hydro-electric (Group) Co., Ltd. held the rest of 25%. The restructuring enabled CLP to exercise greater control over the project. Five of these power stations were commissioned between 1975 and 1996 while four new stations were completed at the end of 2001. The largest of the stations was the 36 MW Gaotang scheme while the smallest was the 1.5 MW Longzhongtan scheme. With all nine power stations completed, the Huaiji scheme was expected generate 390 GWH annually. |
Original sector | Energy |
Budget |
Location
Country | China |
State | Guangdong |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Hydro, Power Generation (CCGT) |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in China
- Black Point Combined Cycle Power Plant Hong Kong
- Hongyanhe Nuclear Power Plant Liaoning
- Yangcheng CoalFired Power Plant Shanxi Province
- Tianhuangping PumpedStorage Hydro Plant
- Xiangjiaba Hydropower Plant
- Fuqing Nuclear Power Plant Fujian
- Huoqiu County Pipeline Gas Project
- Fuchuan Xiehe Shijia Wind Power Plant