logo

Guangxi Laibin Water Environment Project

Sector: Road • Location: China

Source: World Bank

Project
Closed

The development objective of the Guangxi Laibin Water Environment Project for China is to reduce flood risks and improve drainage in selected areas of Laibin city. The project has four components. The first component is river flood risk reduction. This component will:(a) upgrade flood protection related infrastructure along the Hongshui, Benzhijiang and Longdong rivers, including, the strengthenin

Project Information FAQ

Project Information

5 Q
The project “Guangxi Laibin Water Environment Project” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Guangxi Laibin Water Environment Project for China is to reduce flood risks and improve drainage in selected areas of Laibin city. The project has four components. The first component is river flood risk reduction. This component will:(a) upgrade flood protection related infrastructure along the Hongshui, Benzhijiang and Longdong rivers, including, the strengthening of existing natural embankments, as well as the construction and or rehabilitation of pumping stations, sluice gates, and flood protection dikes; and (b) install and set up an integrated flood control and water quality monitoring system. The second component is improving urban drainage. This component will: (a) rehabilitate water streams through, cleaning-up and de-silting of canals, rehabilitation of natural embankments, ecological restoration and re-vegetation of embankments, and construction of regulating gates and rubber dams; (b) expand and separate sewage and storm drainage networks in the old urban area of Laibin city; (c) construct and rehabilitate pumping stations, control and sluice gates, and rubber dams; and (d) pilot low impact sustainable drainage systems along urban roads of Laibin city. The third component is technical assistance and capacity building. This component will carry activities on: (a) integrated flood risk management, including flood control and reduction of flood risks through, the development of flood maps, improvement of modeling capacity, and design and implementation of early warning systems; and (b) asset management and capital replenishment, aimed at improving the operation and maintenance of assets, budgeting and training of staff. The fourth component is project management and supervision. This component will support the overall development of the project implementing entity to coordinate and manage the implementation of the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data