logo
ProjectClosed

Guangxi Laibin Water Environment Project

One of 10,000+ projects Taiyo tracks in China.

Source: World Bank

The development objective of the Guangxi Laibin Water Environment Project for China is to reduce flood risks and improve drainage in selected areas of Laibin city. The project has four components. The first component is river flood risk reduction. This component will:(a) upgrade flood protection related infrastructure along the Hongshui, Benzhijiang and Longdong rivers, including, the strengthenin

Status
Closed
Sector
Road, Water Supply and Storage, Waste Processing and Treatment, Forest Products and Packaging, Commercial, Government
Location
China
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Guangxi Laibin Water Environment Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Guangxi Laibin Water Environment Project” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Guangxi Laibin Water Environment Project for China is to reduce flood risks and improve drainage in selected areas of Laibin city. The project has four components. The first component is river flood risk reduction. This component will:(a) upgrade flood protection related infrastructure along the Hongshui, Benzhijiang and Longdong rivers, including, the strengthening of existing natural embankments, as well as the construction and or rehabilitation of pumping stations, sluice gates, and flood protection dikes; and (b) install and set up an integrated flood control and water quality monitoring system. The second component is improving urban drainage. This component will: (a) rehabilitate water streams through, cleaning-up and de-silting of canals, rehabilitation of natural embankments, ecological restoration and re-vegetation of embankments, and construction of regulating gates and rubber dams; (b) expand and separate sewage and storm drainage networks in the old urban area of Laibin city; (c) construct and rehabilitate pumping stations, control and sluice gates, and rubber dams; and (d) pilot low impact sustainable drainage systems along urban roads of Laibin city. The third component is technical assistance and capacity building. This component will carry activities on: (a) integrated flood risk management, including flood control and reduction of flood risks through, the development of flood maps, improvement of modeling capacity, and design and implementation of early warning systems; and (b) asset management and capital replenishment, aimed at improving the operation and maintenance of assets, budgeting and training of staff. The fourth component is project management and supervision. This component will support the overall development of the project implementing entity to coordinate and manage the implementation of the project.

Original sector

FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

China

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Waste Processing and Treatment, Forest Products and Packaging, Commercial, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project