Guangxi Tianlin Lucheng Nabang 100MW wind power project

Sector: Wind • Location: China

Source: World Bank Group

Project
Active

The project comprises the construction of Guangxi Tianlin Lucheng Nabang 100MW wind power farm in Guangxi Province, China. The project company is Guangxi Tianlin Weneng New Energy Co., Ltd. and the spnsor is State Power Investment Guangxi Jinyuan Southern New Energy Company, a subsidiary of China Power Co., awarded the EPC contract to Aneng Technology. The total investment of the project is RMB 75

Project Information FAQ

Project Information

4 Q
The project “Guangxi Tianlin Lucheng Nabang 100MW wind power project” is an infrastructure initiative in the Wind sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the construction of Guangxi Tianlin Lucheng Nabang 100MW wind power farm in Guangxi Province, China. The project company is Guangxi Tianlin Weneng New Energy Co., Ltd. and the spnsor is State Power Investment Guangxi Jinyuan Southern New Energy Company, a subsidiary of China Power Co., awarded the EPC contract to Aneng Technology. The total investment of the project is RMB 750.71 million, of which RMB 150.14 million is project capital , accounting for 20 % of the total investment, which is funded by the project unit with its own funds, and the rest is solved by bank loans and other means. The total value of the poject is $103.68m or RMB 750.71 million and the construction period is 364 days. The equity is 20% of the total investment, and the rest is solved by bank loans and other means. ?he planned installed capacity is 100MW: 20 wind turbines with a single unit capacity of 5000kW are planned to be installed. A new 220kV booster station and energy storage facilities will be built. The iniative was approved by the State authorities on April 19th, 2024. https://wind.imarine.cn/news/91567.html ; http://fgw.gxzf.gov.cn/zfxxgkzl/wjzx/xmpf/xiangmuhezhunpifu/t11780436.shtml https://wind.imarine.cn/news/91567.html ; http://fgw.gxzf.gov.cn/zfxxgkzl/wjzx/xmpf/xiangmuhezhunpifu/t11780436.shtml

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data