Guaratuba Bridge
The owner, status and timeline of this project. A free account opens every field.
Source: Folha do Litoral News
The Guaratuba Bridge is a cable-stayed bridge over 1,240 meters long, featuring four traffic lanes, two safety lanes in each direction, sidewalks with bike paths, and guardrails. The project includes land access at the two entrances, covering just over 3 kilometers. It connects Matinhos and Guaratuba, replacing the ferry crossing, and is in the final stages of construction with work focused on acc
- Status
- Under Construction
- Sector
- Road, Bridge, Government, Warehouse
- Location
- Guaratuba, Paraná, Brazil
- Updated
- 22 Jul 2026
- Source
- Folha do Litoral News
ConstructChat
Ask ConstructChat about Guaratuba Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Guaratuba Bridge is a cable-stayed bridge over 1,240 meters long, featuring four traffic lanes, two safety lanes in each direction, sidewalks with bike paths, and guardrails. The project includes land access at the two entrances, covering just over 3 kilometers. It connects Matinhos and Guaratuba, replacing the ferry crossing, and is in the final stages of construction with work focused on access roads and finishing. |
Original sector | Infrastructure |
Location
Country | Brazil |
State | Paraná |
City | Guaratuba |
Source
Source | Folha do Litoral News |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government, Warehouse |
Article published date | 2026-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
