logo
ProjectClosed

GUAVIO HYDROPOWER

Closed · Colombia

Source: World Bank Group

The Guavio hydropower plant will be the largest hydroelectric facility yet constructed in Colombia. In addition to increasing the supply of renewable energy, the Guavio Hydro Power Project will provide 15 of the electricity needed in Colombia by 1988, a substantial part of which will be for the city of Bogota, and its environs. The project consists of: (a) river diversion, dam and spillway tunnels

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Tunnel, Government, Hydro, Telecommunications
Location
Colombia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about GUAVIO HYDROPOWER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “GUAVIO HYDROPOWER” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Guavio hydropower plant will be the largest hydroelectric facility yet constructed in Colombia. In addition to increasing the supply of renewable energy, the Guavio Hydro Power Project will provide 15 of the electricity needed in Colombia by 1988, a substantial part of which will be for the city of Bogota, and its environs. The project consists of: (a) river diversion, dam and spillway tunnels; (b) intake and diversion of the Chivor and Batatas Rivers into the Guavio reservoir; (c) pressure tunnel, underground powerhouse and transformer caverns, and tailrace tunnel; and (d) a 230 kV step-up substation at the site, two double-circuit 230 kV transmission lines to Bogota, and four 230 kV line bays at the Bogota 230 kV ring. The project further includes construction of EEEB's load dispatch and telecommunications center, which will function as a regional satellite of the national dispatch center under constrution by ISA. Also included is a study to assist in adequately protecting the environment of the Guavio River, and a training program. In connection with the project, a substantial part of the sector will be reorganized to improve its overall viability and efficiency.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Colombia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Tunnel, Government, Hydro, Telecommunications

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project