GUAVIO HYDROPOWER
Sector: Water Supply and Storage • Location: Colombia
Source: World Bank Group
The Guavio hydropower plant will be the largest hydroelectric facility yet constructed in Colombia. In addition to increasing the supply of renewable energy, the Guavio Hydro Power Project will provide 15 of the electricity needed in Colombia by 1988, a substantial part of which will be for the city of Bogota, and its environs. The project consists of: (a) river diversion, dam and spillway tunnels
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Guavio hydropower plant will be the largest hydroelectric facility yet constructed in Colombia. In addition to increasing the supply of renewable energy, the Guavio Hydro Power Project will provide 15 of the electricity needed in Colombia by 1988, a substantial part of which will be for the city of Bogota, and its environs. The project consists of: (a) river diversion, dam and spillway tunnels; (b) intake and diversion of the Chivor and Batatas Rivers into the Guavio reservoir; (c) pressure tunnel, underground powerhouse and transformer caverns, and tailrace tunnel; and (d) a 230 kV step-up substation at the site, two double-circuit 230 kV transmission lines to Bogota, and four 230 kV line bays at the Bogota 230 kV ring. The project further includes construction of EEEB's load dispatch and telecommunications center, which will function as a regional satellite of the national dispatch center under constrution by ISA. Also included is a study to assist in adequately protecting the environment of the Guavio River, and a training program. In connection with the project, a substantial part of the sector will be reorganized to improve its overall viability and efficiency. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
