logo

Guayaquil International Airport

Sector: Airport • Location: Ecuador

Source: World Bank Group

Project
Active

In December 2003, the Guayaquil Airport Authority (AAG) awarded a 15-year concession to build, rehabilitate, operate and transfer the Guayaquil International Airport to Terminal Aeroportuaria de Guayaquil SA (TAGSA). The project stipulated that TAGSA had 29 months from the signing of the contract (February 2004) to complete expansion works that included a new international terminal with capacity f

Project Information FAQ

Project Information

5 Q
The project “Guayaquil International Airport” is an infrastructure initiative in the Airport sector, located in Ecuador. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2003, the Guayaquil Airport Authority (AAG) awarded a 15-year concession to build, rehabilitate, operate and transfer the Guayaquil International Airport to Terminal Aeroportuaria de Guayaquil SA (TAGSA). The project stipulated that TAGSA had 29 months from the signing of the contract (February 2004) to complete expansion works that included a new international terminal with capacity for three million passengers per year, a cargo terminal and a control tower as part of an investment plan to regain the airports' status as a category 1 airport. Works also included the repair of the existing runway and construction of an internal bus road linking the national and international terminals. Construction began in mid 2004 and was expected to be finished by July 2006. TAGSA was formed by the New York based American International Airports (AIA), Argentina’s Corporacion America SA (CASA) and the local Deller Group. The project cost was estimated at US$80 million. The contract was awarded thorugh a competitive tender in which the bidding criteria was the highest percentage of gross income to be paid to the government. TAGSA won by offering 50.5%; the consortium formed by Hidalgo & Hidalgo and Aena offered 35.57%, and a consortium of Agunsa and Odebrecht 29.12%. AAG established a minimum bid of 20%. Income at the airport was expected to be about US$20 million, which means Corporacion America will pay around US$10 million annually. In 2008, the contract was extended until 2024. Terminal Aerea de Guayaquil SA (TAGSA): http://www.tagsa.aero/ Ecuadorian city Guayaquil's new international airport terminal José Joaquín de Olmedo will become fully operational on August 14, 2006. Guayaquil's former terminal Simón Bolívar will end operations once the new one becomes fully functional, and within a year it is expected to be turned into a convention center, as well as a land terminal.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data