Guest Quarters Construction
Closed · California · Last reported Nov 2024
Source: Dodge USA
Remove 720 sf. Uncovered outdoor deck attached to 2nd floor of residence on site, and replace with proposed 720 sf new deck. Footprint of new deck now matches existing.- construct 999 sf. Two story detached guest quarters and exercise room, with 283 sf of deck area.- owner changes: relocate guest quarters to front portion of the property; remove windows 3, 5, 6, and10; reduce size of window 14. pl
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Hotel, Residential
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Guest Quarters Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove 720 sf. Uncovered outdoor deck attached to 2nd floor of residence on site, and replace with proposed 720 sf new deck. Footprint of new deck now matches existing.- construct 999 sf. Two story detached guest quarters and exercise room, with 283 sf of deck area.- owner changes: relocate guest quarters to front portion of the property; remove windows 3, 5, 6, and10; reduce size of window 14. plumbing, electric, and HVAC |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Hotel, Residential |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
