Guggenheim Museum
Sector: Bridge • Location: Basque Country, Spain
Source: Ferrovial
Ferrovial Business Lines Projects Guggenheim Museum Basque Country, Spain Official website of Guggenheim Museum Read articles about the Guggenheim Museum on our Ferrovial Blog 24000m² Surface 14m Average Depth The construction of Bilbao's Guggenheim Museum is one of our most remarkable projects. The Guggenheim Museum Bilbao spans 24,000 square metres and is built on a 46,000 square metre site in
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Ferrovial Business Lines Projects Guggenheim Museum Basque Country, Spain Official website of Guggenheim Museum Read articles about the Guggenheim Museum on our Ferrovial Blog 24000m² Surface 14m Average Depth The construction of Bilbao's Guggenheim Museum is one of our most remarkable projects. The Guggenheim Museum Bilbao spans 24,000 square metres and is built on a 46,000 square metre site in the shape of an irregular triangle, crossed by the Salve Bridge. We built the museum, which included concrete foundations, erecting the metal structure, inner walls, installations and site development. This project, a symbol of modernity for the city, received the VI International Puente de Alcántara Award. Ferrovial | Construcción del Museo Guggenheim (Bilbao) A masterpiece of construction and architecture The foundation was laid on reinforced concrete piles driven into the bedrock at an average depth of 14 metres. Then, a unique metal structure was built on top of the piles and concrete slabs, using steel profiles to configure the skeleton of the core components. A number of much more complex metal structures, in terms of their placement and size, were mounted on top of the main structure. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
