logo

Guilin Integrated Environment Management

Sector: Airport • Location: China

Source: World Bank Group

Project
Closed

The objective of the Guilin Integrated Environment Management Project in China is to improve water and sanitation services in Guilin. The project is made of five components and are as follows: (1) Water Supply. Investments under this component will improve the water supply system to fully meet current and projected future demand of domestic consumers, commercial and industrial enterprises, an expa

Status
Closed
Sector
Airport, Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Forest Products and Packaging, Commercial, Government, Education
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Guilin Integrated Environment Management

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Guilin Integrated Environment Management” is an infrastructure initiative in the Airport sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Guilin Integrated Environment Management Project in China is to improve water and sanitation services in Guilin. The project is made of five components and are as follows: (1) Water Supply. Investments under this component will improve the water supply system to fully meet current and projected future demand of domestic consumers, commercial and industrial enterprises, an expanding airport, and two expanding universities. The component will involve: (a) installation of a trunk water main and associated distribution and reticulation pipelines; (b) construction of a booster pumping station; and, (c) provision of monitoring and inspection equipment in the network to improve compliance with the new drinking water quality standard; and (d) development and installation of a decision support system for improved operational efficiency. (2) Wastewater Management. This component focuses on maintaining the water quality of Lijiang River by improving the collection and treatment capacity of Guilin’s Wastewater Treatment Plants (WWTPs) by: (a) replacing aged equipment at selected pumping stations and the installation of additional odor control; (b) expanding, replacing or rehabilitating sewer networks and provision of necessary; (c) upgrading four WWTPs to improve the quality of effluent discharges, and associated odor control and disinfection equipment; (d) upgrading sludge dewatering equipment at three WWTPs and installing associated ventilation and odor control facilities at all five WWTPs, and (e) provision of monitoring and sewer maintenance equipment. (3) Sludge Management. This component aims to enhance sludge management thus preventing environmental pollution from inappropriate sludge disposal by: (a) constructing a sludge management center and associated ventilation and odor control facilities; and (b) procurement of sludge hauling trucks and sewer maintenance trucks. (4) Water Quality Monitoring and Pollution Management. This component involves: (a) strengthening of the water quality monitoring system to enable real-time data collection and processing; (b) development of a pollution management system for effective monitoring and management river water quality; and (c) piloting of a pollution source analysis for urban stretches of the Lijiang River. (5) Project Management and Supervision. This component involves the provision of Technical Assistance (TA) and training for project management and supervision. The component will fund: (a) project management, including monitoring and evaluation (M&E); (b) consultancy services for engineering design review and least-cost review of sludge options, and supervision of the implementation of environmental assessments, and resettlement action plans; (c) incremental operating support for PMO operation during implementation; and (d) training and study tours.

Original sector

FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Airport, Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Forest Products and Packaging, Commercial, Government, Education

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project