Guimond Street and Labrie Street - Town of Saint-Quentin
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
Guimond Street’s sanitary sewers, water and stormwater infrastructure have reached the end of their serviceable life and need to be replaced to mitigate recurring flooding and the contamination of drinking water. The project involves the following: Water: the upgrade of 830m of water pipes that have reached the end of their serviceable life and the installation of 5 fire hydrants to meet safety no
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Guimond Street’s sanitary sewers, water and stormwater infrastructure have reached the end of their serviceable life and need to be replaced to mitigate recurring flooding and the contamination of drinking water. The project involves the following: Water: the upgrade of 830m of water pipes that have reached the end of their serviceable life and the installation of 5 fire hydrants to meet safety norms. Sewer Pipes: the upgrade of 760m of sewer pipes that have reached the end of their serviceable life and the new installation of 9 manholes and 42 residential connection pipes. Storm Sewers: the new installation of 160m of sewer pipes and removal of 365m of sewer pipes that have reached the end of their serviceable life, the new installation of 19 manholes to capture surface water and direct it to the new storm sewer pipes, and the installation of 2600 tons of asphalt for the redesigning of the structure and surface of Guimont Street to aid direct surface water towards the upgraded infrastructure. In addition, the following work will be undertaken on Labrie Street: 2 storm/catch basins Approximately 450 meters of road reconstruction (550 tonnes of asphalt with seal) 25 linear meters of sewer main pipe 450 linear meters of perforated drain pipe |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
