logo
Project

Guinea - Addendum Guinea-Mano River Union Road Developement and Transport Facilitation Programme- Phase 3

Sector: Road • Location: Multinational

Source: African Development Bank (AfDB)

This intervention concerns the Mano River Union Road Development and Transport Facilitation programme (MRU/RDTFP), Phase III. It aims to build resilience at the community and regional levels where inadequate physical infrastructure, particularly in the energy, water, and road sectors. The design of the Programme has taken into consideration the fragility of the region resulting from the protracted

Sector
Road, Water Supply and Storage, Bridge, Cement, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Guinea - Addendum Guinea-Mano River Union Road Developement and Transport Facilitation Programme- Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Guinea - Addendum Guinea-Mano River Union Road Developement and Transport Facilitation Programme- Phase 3” is an infrastructure initiative in the Road sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This intervention concerns the Mano River Union Road Development and Transport Facilitation programme (MRU/RDTFP), Phase III. It aims to build resilience at the community and regional levels where inadequate physical infrastructure, particularly in the energy, water, and road sectors. The design of the Programme has taken into consideration the fragility of the region resulting from the protracted civil war which weakened institutional capacity, as well as the high vulnerability of the roads to heavy rains and floods. This Phase 3 of the Programme will consist of: (i) the development and asphalting of: (i) 89 km of road, including 50 km in Liberia and 25 km in Sierra Leone to be upgraded according to ECOWAS standards (7m of pavement and two shoulders of 1.5m each with an asphalt concrete structure); (ii) road studies on 197 km , including 27 km in Guinea, 90km in Sierra Leone and 80 km in Liberia (iii) the construction of a 276 meters bridge over the Makona (Moa) River between Guinea and Sierra Leone. The project primarily contributes to climate adaptation results. As such, 20% of the total approved amount is attributed as climate finance, of which 2 million USD is dedicated to adaptation.

Original sector

Transport & Storage

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Bridge, Cement, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project