Guinea - Addendum Guinea-Mano River Union Road Developement and Transport Facilitation Programme- Phase 3
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
This intervention concerns the Mano River Union Road Development and Transport Facilitation programme (MRU/RDTFP), Phase III. It aims to build resilience at the community and regional levels where inadequate physical infrastructure, particularly in the energy, water, and road sectors. The design of the Programme has taken into consideration the fragility of the region resulting from the protracted
- Sector
- Water Supply and Storage, Cement, Bridge, Automotive, Road, Commercial, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Guinea - Addendum Guinea-Mano River Union Road Developement and Transport Facilitation Programme- Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This intervention concerns the Mano River Union Road Development and Transport Facilitation programme (MRU/RDTFP), Phase III. It aims to build resilience at the community and regional levels where inadequate physical infrastructure, particularly in the energy, water, and road sectors. The design of the Programme has taken into consideration the fragility of the region resulting from the protracted civil war which weakened institutional capacity, as well as the high vulnerability of the roads to heavy rains and floods. This Phase 3 of the Programme will consist of: (i) the development and asphalting of: (i) 89 km of road, including 50 km in Liberia and 25 km in Sierra Leone to be upgraded according to ECOWAS standards (7m of pavement and two shoulders of 1.5m each with an asphalt concrete structure); (ii) road studies on 197 km , including 27 km in Guinea, 90km in Sierra Leone and 80 km in Liberia (iii) the construction of a 276 meters bridge over the Makona (Moa) River between Guinea and Sierra Leone. The project primarily contributes to climate adaptation results. As such, 20% of the total approved amount is attributed as climate finance, of which 2 million USD is dedicated to adaptation. |
Original sector | Transport & Storage |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Bridge, Automotive, Road, Commercial, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational- Ruzizi III regional hydropower plant project
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Post-Ebola Recovery Social Investment Fund Project (Liberia)
- Cameroon - Transport Facilitation Programme on the Douala – Bangui Corridors
- Multinational - Lake Victoria Water Supply and Sanitation Program - Phase II
- Multinational - Nelson Mandela Institutes - African Institutions of Science and Technology Project
