logo
Project

Guinea - Feasibility study of a surface water utilization programme in thirteen (13) prefectures

Sector: Water Supply and Storage • Location: Guinea

Source: African Development Bank (AfDB)

The present intervention concerns the Feasibility study of a surface water utilization programme in thirteen (13) prefectures. It aims to contribute in the long term to the country's food security and poverty reduction in the areas concerned, through the increase in agro-sylvo-pastoral production and the improvement of the living conditions and health status of the population. The study should mak

Sector
Water Supply and Storage, Government, Raw Materials
Location
Guinea
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Guinea - Feasibility study of a surface water utilization programme in thirteen (13) prefectures

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Guinea - Feasibility study of a surface water utilization programme in thirteen (13) prefectures” is an infrastructure initiative in the Water Supply and Storage sector, located in Guinea. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The present intervention concerns the Feasibility study of a surface water utilization programme in thirteen (13) prefectures. It aims to contribute in the long term to the country's food security and poverty reduction in the areas concerned, through the increase in agro-sylvo-pastoral production and the improvement of the living conditions and health status of the population. The study should make it possible to define a programme for the valorisation of surface water on the scale of thirteen (13) prefecture, for an optimal use of these waters. It should be carried out in two phases. The first phase is the identification and assessment/diagnosis phase. A feasibility study with the elaboration of the APS leading to management plans for the respective catchment areas, followed by a detailed study consisting of the elaboration of the APD and the Environmental Impact Assessment should constitute the second phase. This phase should lead to one or more projects to be submitted for funding by one or more donors.

Original sector

Water Supply & Sanitation

Budget

Location

Country

Guinea

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Raw Materials

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project