Guinea - Power Acces Improvement Project (PAAEG)
Sector: Commercial • Location: Guinea
Source: African Development Bank (AfDB)
The Guinea Power Access Improvement Project (PAAEG) is part of the National Least Cost Power Access Rollout Programme (PNAAEMC) initiated by the Government and aimed at achieving universal access to electricity by 2030. The project is designed to address the energy infrastructure needs of areas with low access rates and the institutional weaknesses of electricity sub-sector actors. It does not inc
- Sector
- Commercial, Power Generation (CCGT), Hydro, Road, Government
- Location
- Guinea
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Guinea - Power Acces Improvement Project (PAAEG)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Guinea Power Access Improvement Project (PAAEG) is part of the National Least Cost Power Access Rollout Programme (PNAAEMC) initiated by the Government and aimed at achieving universal access to electricity by 2030. The project is designed to address the energy infrastructure needs of areas with low access rates and the institutional weaknesses of electricity sub-sector actors. It does not include investments in the generation segment but will serve to: (i) ensure that the hydropower generated (Kaléta, Souapiti and Amaria) is delivered to end consumers; and (ii) promote private investment in green energy. It supplements recent projects financed the Bank1 and other TFPs to increase access to energy services for the population in both urban and rural areas. The PAAEG will also contribute not only to capacity building for stakeholders in the electricity sub-sector to improve its management and governance, through institutional support, but also to project preparation, including the conduct of studies on green mini grids. The overall cost of the PAAEG stands at UA 119.99 million and its implementation is planned for the period 2022-2027. |
Original sector | Energy |
Budget |
Location
Country | Guinea |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Hydro, Road, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
