logo
Project

Guinea - Power Acces Improvement Project (PAAEG)

Sector: Commercial • Location: Guinea

Source: African Development Bank (AfDB)

The Guinea Power Access Improvement Project (PAAEG) is part of the National Least Cost Power Access Rollout Programme (PNAAEMC) initiated by the Government and aimed at achieving universal access to electricity by 2030. The project is designed to address the energy infrastructure needs of areas with low access rates and the institutional weaknesses of electricity sub-sector actors. It does not inc

Sector
Commercial, Power Generation (CCGT), Hydro, Road, Government
Location
Guinea
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Guinea - Power Acces Improvement Project (PAAEG)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Guinea - Power Acces Improvement Project (PAAEG)” is an infrastructure initiative in the Commercial sector, located in Guinea. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Guinea Power Access Improvement Project (PAAEG) is part of the National Least Cost Power Access Rollout Programme (PNAAEMC) initiated by the Government and aimed at achieving universal access to electricity by 2030. The project is designed to address the energy infrastructure needs of areas with low access rates and the institutional weaknesses of electricity sub-sector actors. It does not include investments in the generation segment but will serve to: (i) ensure that the hydropower generated (Kaléta, Souapiti and Amaria) is delivered to end consumers; and (ii) promote private investment in green energy. It supplements recent projects financed the Bank1 and other TFPs to increase access to energy services for the population in both urban and rural areas. The PAAEG will also contribute not only to capacity building for stakeholders in the electricity sub-sector to improve its management and governance, through institutional support, but also to project preparation, including the conduct of studies on green mini grids. The overall cost of the PAAEG stands at UA 119.99 million and its implementation is planned for the period 2022-2027.

Original sector

Energy

Budget

Location

Country

Guinea

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Hydro, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project