Guinea - PPF Fomi Multipurpose Dam Project
Sector: Raw Materials • Location: Guinea
Source: African Development Bank (AfDB)
The PPF Fomi Multi-Purpose Dam Project was designed to enable the complementary studies (detailed engineering) of the Fomi Multi-Purpose Dam Project. This intervention will finance the detailed studies for the construction of a dam (a 2.9 billion m3 reservoir and a 2.3 billion m3 regulation volume) equipped with a hydroelectric power plant (90 MW) to supply Guinea and Mali and the development of 3
- Sector
- Raw Materials, Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- Guinea
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Guinea - PPF Fomi Multipurpose Dam Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The PPF Fomi Multi-Purpose Dam Project was designed to enable the complementary studies (detailed engineering) of the Fomi Multi-Purpose Dam Project. This intervention will finance the detailed studies for the construction of a dam (a 2.9 billion m3 reservoir and a 2.3 billion m3 regulation volume) equipped with a hydroelectric power plant (90 MW) to supply Guinea and Mali and the development of 3500 ha of irrigated areas in Guinea and Mali. The main expected outputs are: (i) a final ODA study report; (ii) a final ESIA report including an Environmental and Social Management Plan (ESMP); (iii) a comprehensive resettlement plan (CRP) validated by stakeholders; (iv) a climate change vulnerability analysis; (v) an institutional and cost-benefit sharing study report; (vi) tender documents for the works; (vii) a monitoring and evaluation manual and its implementation mechanism; (viii) a report on the configuration of the management software and the implementation of the management system; and (ix) two audit reports. |
Original sector | General Budget Support |
Budget |
Location
Country | Guinea |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Guinea
- Société des Grands Moulins de Guinée S.A.
- Guinea - Rural Electrification Project
- OMVG - INTERCONNECTION
- INTERCONNEXION ELECTRIQUE 225 KV GUINEE-MALI
- ENERGY EFFICIENCY TELECOM GUINEA
- Simandou-Conakry Railway (or Transguinean Railway)
- Fomi Multi-purpose Dam (Niger River Basin)
- Guinea - Project to Support Agropastoral Development Digitisation and Market Access in Guinea (PADDAMAG)
