logo
Project

Guinea - PPF Fomi Multipurpose Dam Project

Sector: Raw Materials • Location: Guinea

Source: African Development Bank (AfDB)

The PPF Fomi Multi-Purpose Dam Project was designed to enable the complementary studies (detailed engineering) of the Fomi Multi-Purpose Dam Project. This intervention will finance the detailed studies for the construction of a dam (a 2.9 billion m3 reservoir and a 2.3 billion m3 regulation volume) equipped with a hydroelectric power plant (90 MW) to supply Guinea and Mali and the development of 3

Sector
Raw Materials, Water Supply and Storage, Power Generation (CCGT), Hydro, Government
Location
Guinea
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Guinea - PPF Fomi Multipurpose Dam Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Guinea - PPF Fomi Multipurpose Dam Project” is an infrastructure initiative in the Raw Materials sector, located in Guinea. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The PPF Fomi Multi-Purpose Dam Project was designed to enable the complementary studies (detailed engineering) of the Fomi Multi-Purpose Dam Project. This intervention will finance the detailed studies for the construction of a dam (a 2.9 billion m3 reservoir and a 2.3 billion m3 regulation volume) equipped with a hydroelectric power plant (90 MW) to supply Guinea and Mali and the development of 3500 ha of irrigated areas in Guinea and Mali. The main expected outputs are: (i) a final ODA study report; (ii) a final ESIA report including an Environmental and Social Management Plan (ESMP); (iii) a comprehensive resettlement plan (CRP) validated by stakeholders; (iv) a climate change vulnerability analysis; (v) an institutional and cost-benefit sharing study report; (vi) tender documents for the works; (vii) a monitoring and evaluation manual and its implementation mechanism; (viii) a report on the configuration of the management software and the implementation of the management system; and (ix) two audit reports.

Original sector

General Budget Support

Budget

Location

Country

Guinea

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Water Supply and Storage, Power Generation (CCGT), Hydro, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project