logo
Project

Guinea - Rural Electrification Project

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The Rural Electrification Project (PER) covers 31 localities along the national interconnected grid situated in Basse and Moyenne Guinée. The localities are located in the Basse and Moyenne Guinée Regions, both of which have significant economic potential and are crossed by asphalted roads. The project will also include the conduct of two studies essential for preparing future energy sector operat

Sector
Commercial, Fertilizers, Power Generation (CCGT), Road, Government
Location
Guinea
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Guinea - Rural Electrification Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Guinea - Rural Electrification Project” is an infrastructure initiative in the Commercial sector, located in Guinea. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Rural Electrification Project (PER) covers 31 localities along the national interconnected grid situated in Basse and Moyenne Guinée. The localities are located in the Basse and Moyenne Guinée Regions, both of which have significant economic potential and are crossed by asphalted roads. The project will also include the conduct of two studies essential for preparing future energy sector operations in Guinea by the Bank and other donors. The project will improve the living and working conditions of the people, boost the development of small-scale businesses and market garden crop preservation and processing, and generally improve the business environment of micro-enterprises and SMEs/SMIs in the target area. In addition, it will help raise the rural electrification rate from 3% in 2009 to 15% in 2015 and reduce the rate of energy loss on the distribution network from 48% in 2009 to 20% in 2015. The overall project cost, net of taxes will amount to UA 15.053 million. It will be implemented over the 2011-2014 period.

Original sector

Energy

Budget

Location

Country

Guinea

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Fertilizers, Power Generation (CCGT), Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project