Guinea - Support Project for the National Rural Infrastructure Programme, Phase II (PNIR2)
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The present project is relative to the second phase of the National Program of Rural Infrastructures (PNIR-2) whose first phase (PNIR-1) was to define a strategy for the realization of rural infrastructures. It aims to remove the following constraints: (i) the degraded state of rural roads preventing the supply of inputs and the marketing of surplus production; (ii) the difficulty of access to lan
- Sector
- Raw Materials, Commercial, Power Generation (CCGT), Hydro, Road, Government
- Location
- Guinea
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Guinea - Support Project for the National Rural Infrastructure Programme, Phase II (PNIR2)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present project is relative to the second phase of the National Program of Rural Infrastructures (PNIR-2) whose first phase (PNIR-1) was to define a strategy for the realization of rural infrastructures. It aims to remove the following constraints: (i) the degraded state of rural roads preventing the supply of inputs and the marketing of surplus production; (ii) the difficulty of access to land and the lack of secure land transactions; (iii) the incompetence of the decentralized institutions as project owner in the implementation of local development plans (PDL) and land legislation; and (iv) demobilization of village runway maintenance committees (VECs) created in PNIR-1. The expected effects of the program are: i) facilitation of access to schools and health centers, ii) strengthening of commercial and production activities, iii) strengthening of food security, iv) opening up of 70 Rural Development Communities (CRDs) in 11 target prefectures of the project, v) reduction of 25% of transport time between CRD, vi) increase in road density from 2.9 km to 6 km / 100 km2, vii) reduction of poverty rate from 52.5% to 45%. The PNIR-2 comprises three (03) components, namely: (i) rehabilitation of 1,080 km of community roads for the opening up of 70 Rural Development Communities (RDCs) in 9 prefectures; (ii) improving tenure security in two pilot CRDs; and iii) project coordination. |
Original sector | Other Multisector |
Budget |
Location
Country | Guinea |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Commercial, Power Generation (CCGT), Hydro, Road, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Guinea
- Société des Grands Moulins de Guinée S.A.
- Guinea - Rural Electrification Project
- OMVG - INTERCONNECTION
- INTERCONNEXION ELECTRIQUE 225 KV GUINEE-MALI
- Guinea - PPF Fomi Multipurpose Dam Project
- ENERGY EFFICIENCY TELECOM GUINEA
- Simandou-Conakry Railway (or Transguinean Railway)
- Fomi Multi-purpose Dam (Niger River Basin)
