Guinea - Tombo-Gbessia Road Improvement Project
Sector: Rail • Location: Guinea
Source: African Development Bank (AfDB)
Tombo-Gbessia Road Improvement Project is designed to support Government policy by increasing the contribution of road transport to national economic development. This should be done through rehabilitation and development of national roads, primary roads, and major highways. The Tombo-Gbessia road is a throughway that prolongs National Highway No. 1 (NH1) right up to Conakry Port. It is the main c
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Tombo-Gbessia Road Improvement Project is designed to support Government policy by increasing the contribution of road transport to national economic development. This should be done through rehabilitation and development of national roads, primary roads, and major highways. The Tombo-Gbessia road is a throughway that prolongs National Highway No. 1 (NH1) right up to Conakry Port. It is the main connection between the Capital and the hinterland and is one of the major urban roads in the city of Conakry. The expected project outcomes are summed up as follows: (i) About 10.7 km of paved road improved between Tombo and Gbessia Airport; 3,407 km of feeder roads developed in Kenien and Bonfi; 8 safe water points installed in the Madina (5) and Bonfi (3) markets; (ii) five (5) interchanges, two (2) roundabouts and seven (7) pedestrian overpasses constructed; 2 (two) bridges, one for the road and the other for the railway; (iii) One (1) bus station built in Yimbaya on a surface area of 41 000 m2; (iv) Technical and operational capacity of the NRID and NDDPI; and (v) about 15,000 people in the project area sensitized to environmental protection, road safety, malaria control, waterborne diseases, STDs and HIV/AIDS, and protected against these diseases. The entire project comprises three components: A) works; B) institutional support and C) project management. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
