logo
Project

Guinea - Tombo-Gbessia Road Improvement Project

One of 1,247 projects Taiyo tracks in Guinea.

Source: African Development Bank (AfDB)

Tombo-Gbessia Road Improvement Project is designed to support Government policy by increasing the contribution of road transport to national economic development. This should be done through rehabilitation and development of national roads, primary roads, and major highways. The Tombo-Gbessia road is a throughway that prolongs National Highway No. 1 (NH1) right up to Conakry Port. It is the main c

Sector
Rail, Water Supply and Storage, Airport, Mass Transit, Road, Government
Location
Guinea
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Guinea - Tombo-Gbessia Road Improvement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Guinea - Tombo-Gbessia Road Improvement Project” is an infrastructure initiative in the Rail sector, located in Guinea. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Tombo-Gbessia Road Improvement Project is designed to support Government policy by increasing the contribution of road transport to national economic development. This should be done through rehabilitation and development of national roads, primary roads, and major highways. The Tombo-Gbessia road is a throughway that prolongs National Highway No. 1 (NH1) right up to Conakry Port. It is the main connection between the Capital and the hinterland and is one of the major urban roads in the city of Conakry. The expected project outcomes are summed up as follows: (i) About 10.7 km of paved road improved between Tombo and Gbessia Airport; 3,407 km of feeder roads developed in Kenien and Bonfi; 8 safe water points installed in the Madina (5) and Bonfi (3) markets; (ii) five (5) interchanges, two (2) roundabouts and seven (7) pedestrian overpasses constructed; 2 (two) bridges, one for the road and the other for the railway; (iii) One (1) bus station built in Yimbaya on a surface area of 41 000 m2; (iv) Technical and operational capacity of the NRID and NDDPI; and (v) about 15,000 people in the project area sensitized to environmental protection, road safety, malaria control, waterborne diseases, STDs and HIV/AIDS, and protected against these diseases. The entire project comprises three components: A) works; B) institutional support and C) project management.

Original sector

Transport & Storage

Budget

Location

Country

Guinea

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Rail, Water Supply and Storage, Airport, Mass Transit, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project