Guinea – Diécké Oil Palm and Rubber Project Soguipah III
Sector: Oil and Gas • Location: Guinea
Source: African Development Bank (AfDB)
The Diécké Oil Palm and Rubber Project Soguipah III is designed as part of the launch of the agro-industrial development programme in the Niékoré plain. This is the logical continuation of the previous phases that have been successfully completed. This project corresponds to the objectives of the country's agricultural policy (food self-sufficiency, diversification and increase in production, incr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Diécké Oil Palm and Rubber Project Soguipah III is designed as part of the launch of the agro-industrial development programme in the Niékoré plain. This is the logical continuation of the previous phases that have been successfully completed. This project corresponds to the objectives of the country's agricultural policy (food self-sufficiency, diversification and increase in production, increase in exports). It aims to increase the country's external resources through rubber exports and to meet domestic needs for fats, in the form of consumer oil and soap. It also contributes to the implementation of the policy of diversifying economic activities, which has hitherto been almost exclusively dominated by the exploitation of mining resources. This project contributes to poverty reduction in forest Guinea. It has four main components, namely: A) construction of an oil mill with a maximum capacity of 10 tonnes per hour on the basis of 500 hours per month and 220 tonnes per month of soap; B) construction of a rubber processing plant with an initial nominal capacity of 2 tonnes per hour; C) crop expenditure; D) workers' housing; E) equipment and rolling stock; F) studies and engineering; G) technical assistance; and H) national staff. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
