Guinea Electricity Access Scale Up Project-Phase 2

One of 1,247 projects Taiyo tracks in Guinea.

Source: World Bank Group

The Guinea Electricity Access Scale Up Project-Phase 2 (GNEAP-2) is a US$271.8 million Investment Project Financing (IPF) with performance-based conditions (PBCs) and in alignment with the M300 initiative. US$132.3 million will be financed by IDA, US$100.0 million by the European Investment Bank (EIB) as parallel co-financing, and US$11.7 million of private capital mobilized (PCM). The Government

Status
Prospective
Sector
Solar, Power Transmission, Power Generation (CCGT), Government, Commercial
Location
Guinea
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Guinea Electricity Access Scale Up Project-Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Guinea Electricity Access Scale Up Project-Phase 2” is an infrastructure initiative in the Solar sector, located in Guinea. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Guinea Electricity Access Scale Up Project-Phase 2 (GNEAP-2) is a US$271.8 million Investment Project Financing (IPF) with performance-based conditions (PBCs) and in alignment with the M300 initiative. US$132.3 million will be financed by IDA, US$100.0 million by the European Investment Bank (EIB) as parallel co-financing, and US$11.7 million of private capital mobilized (PCM). The Government of Guinea is exploring options to close the remaining US$27.8 million financing gap.GNEAP-2 builds on GNEAP-1 to expand access to electricity while deepening reforms to strengthen the sector’s financial and operational sustainability. The project supports Guinea’s Mission 300 (M300) commitment and will generate substantial climate co-benefits.The Project Development Objective (PDO) is to: (i) increase grid and non-grid access to electricity services in selected areas; and (ii) improve the operational performance of the power utility.Component 1 – Reinforcement and expansion of grid access and improvement of commercial performance of EDG. This component includes grid extension and densification in Kindia, Labe, Mamou, Pita, and Dalaba, the construction of two new MV lines (Kindia–Donkea and Mamou–Labe), and rural electrification. It also supports EDG’s digitalization and commercial upgrades.Component 2 – Off-grid electrification with privately operated hybrid mini-grid systems. Electrification of 26 localities through solar-diesel hybrid mini-grids operated by private developers. The component targets 36,041 households and 4,258 businesses, using subsidies to attract private capital (expected PCM).Component 3 – Support to reform actions and financial sustainability of the energy sector. Includes PBCs for prepaid meter deployment in non-strategic public institutions. Technical assistance for operationalizing the sector recovery plan, the EDG performance contract, and tariff reform.Component 4 – Implementation support, technical assistance, and capacity building. Includes project management, environmental and social safeguards, owner’s engineer, compensation payments, gender-focused programs, and studies on climate resilience and energy mix diversification.

Original sector

Energy and Mineral Resources

Location

Country

Guinea

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Transmission, Power Generation (CCGT), Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project