logo
ProjectDelayed

Guitar Unit Drilling Project

Delayed · Alaska · Last reported Jun 2019

Source: Petroleum News

The project involves drilling a well in the Guitar unit on the North Slope, adjacent to the Prudhoe Bay unit. The project has faced delays due to the failure to post a required bond and the need for a farm-in partner to share drilling costs.

Status
Failure
Sector
Raw Materials, Oil and Gas
Location
Alaska, United States of America
Updated
22 Jul 2026
Source
Petroleum News

ConstructChat

Ask ConstructChat about Guitar Unit Drilling Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Guitar Unit Drilling Project” is an infrastructure initiative in the Raw Materials sector, located in Alaska, United States. Taiyo aggregates data on it from Petroleum News.

Participants

Not available for this record.

Status

Original status

delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves drilling a well in the Guitar unit on the North Slope, adjacent to the Prudhoe Bay unit. The project has faced delays due to the failure to post a required bond and the need for a farm-in partner to share drilling costs.

Original sector

Oil and Gas

Budget

Location

Country

United States of America (USA)

State

Alaska

Source

Source

Petroleum News

URL

More Details

Record type

Project

Sector

Raw Materials, Oil and Gas

Article published date

2026-04-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project