Guitar Unit Drilling Project
Delayed · Alaska · Last reported Jun 2019
Source: Petroleum News
The project involves drilling a well in the Guitar unit on the North Slope, adjacent to the Prudhoe Bay unit. The project has faced delays due to the failure to post a required bond and the need for a farm-in partner to share drilling costs.
- Status
- Failure
- Sector
- Raw Materials, Oil and Gas
- Location
- Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Petroleum News
ConstructChat
Ask ConstructChat about Guitar Unit Drilling Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves drilling a well in the Guitar unit on the North Slope, adjacent to the Prudhoe Bay unit. The project has faced delays due to the failure to post a required bond and the need for a farm-in partner to share drilling costs. |
Original sector | Oil and Gas |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
Source
Source | Petroleum News |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Oil and Gas |
Article published date | 2026-04-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States
- Joint Forces Training Base (JFTB)
- Bayou Bridge Pipeline Project, Louisiana
- Westlake Hydrocracker Facility, LA
- Keystone XL Crude Oil Pipeline
- EnLink Midstream’s Ohio River Valley Condensate Pipeline, Utica Shale, Ohio
- Hilmar Cheese Plant, Dallam County, Dalhart, Texas
- Pepperidge Farm Bakery Plant
- Kellogg’s Food Processing Plant, Georgia
