Gujarat Wind Power Project Expansion
Sector: Power Generation (CCGT) • Location: Sayla, Gujarat, India
Source: TipRanks
ACME Solar Holdings Limited's subsidiary, ACME Eco Clean Energy Private Limited, has commissioned an additional 4 MW capacity at its 100 MW wind power project in Titoda, Sayla, Surendranagar district, Gujarat. This increases the operational capacity to 56 MW, marking steady progress in the phased rollout of the wind facility and strengthening ACME's position in India's renewable energy market.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Wind, Solar
- Location
- Sayla, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- TipRanks
ConstructChat
Ask ConstructChat about Gujarat Wind Power Project Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ACME Solar Holdings Limited's subsidiary, ACME Eco Clean Energy Private Limited, has commissioned an additional 4 MW capacity at its 100 MW wind power project in Titoda, Sayla, Surendranagar district, Gujarat. This increases the operational capacity to 56 MW, marking steady progress in the phased rollout of the wind facility and strengthening ACME's position in India's renewable energy market. |
Original sector | Energy |
Location
Country | India |
State | Gujarat |
City | Sayla |
Source
Source | TipRanks |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Solar |
Article published date | 2025-12-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
