Gul Ahmed Wind Power Plant
Sector: Wind • Location: Pakistan
Source: World Bank Group
Gul Ahmed Wind Power Plant is a 50MW wind power facility run by Gul Ahmed Wind Power Limited, a subsidiary of Gul Ahmed Energy of the Gul Ahmed Group. The project is located about 100km away from the ocean in the middle of the desert in Sindh Province, Pakistan near Jhampir.
Gul Ahmed Wind Power Limited is a SPV sponsored by Gul Ahmed Energy Limited (41.15%), InfraCo Asia (38.85%), and the Intern
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT), Government, Commercial
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Gul Ahmed Wind Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Gul Ahmed Wind Power Plant is a 50MW wind power facility run by Gul Ahmed Wind Power Limited, a subsidiary of Gul Ahmed Energy of the Gul Ahmed Group. The project is located about 100km away from the ocean in the middle of the desert in Sindh Province, Pakistan near Jhampir. Gul Ahmed Wind Power Limited is a SPV sponsored by Gul Ahmed Energy Limited (41.15%), InfraCo Asia (38.85%), and the International Finance Corporation (20%). Gul Ahmed Wind Power Limited signed a PPA with the National Transmission and Dispatch Company Limited (Government of Pakistan). The project will be a 20yr BOOT. Gul Ahmed Wind Power Plant reached Financial Closure in April, 2015 and has an estimated cost of $135.3m USD, of which $33m USD will be financed through equity and $102.3m USD will be financed through debt. Equity will be provide by Gul Ahmed Energy Limited ($41.15m USD), InfraCo ($38.85m USD), and the IFC ($6.6 USD). Debt will be provided by the National Bank of Pakistan ($22.34m USD), the United Bank Limited of Pakistan ($22.34m USD), Alfalah Bank ($11.18m USD), Proparco ($20.64m USD), FMO ($13.73m USD), and the IFC ($12.08m USD). Gul Ahmed Wind Power Plant is expected to started production in December, 2016. Update details of PPA Check status of plant end of 2016 to makes it is online Sources: IJ Global: https://ijglobal.com/data/project/32995/50mw-gul-ahmed-wind-power-project Gul Ahmed Wind Power website: http://www.gaenergy.com/gawind/?page_id=9 NTDC website: http://www.ntdc.com.pk/DeptNewsEvents.php IFC: http://ifcext.ifc.org/IFCExt/spiwebsite1.nsf/0/102497A75E1A99FD85257D8E005BDF99 |
Original sector | Energy |
Budget |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
