logo

Gul Ahmed Wind Power Plant

Sector: Wind • Location: Pakistan

Source: World Bank Group

Project
Active

Gul Ahmed Wind Power Plant is a 50MW wind power facility run by Gul Ahmed Wind Power Limited, a subsidiary of Gul Ahmed Energy of the Gul Ahmed Group. The project is located about 100km away from the ocean in the middle of the desert in Sindh Province, Pakistan near Jhampir.

Gul Ahmed Wind Power Limited is a SPV sponsored by Gul Ahmed Energy Limited (41.15%), InfraCo Asia (38.85%), and the Intern

Project Information FAQ

Project Information

4 Q
The project “Gul Ahmed Wind Power Plant” is an infrastructure initiative in the Wind sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Gul Ahmed Wind Power Plant is a 50MW wind power facility run by Gul Ahmed Wind Power Limited, a subsidiary of Gul Ahmed Energy of the Gul Ahmed Group. The project is located about 100km away from the ocean in the middle of the desert in Sindh Province, Pakistan near Jhampir. Gul Ahmed Wind Power Limited is a SPV sponsored by Gul Ahmed Energy Limited (41.15%), InfraCo Asia (38.85%), and the International Finance Corporation (20%). Gul Ahmed Wind Power Limited signed a PPA with the National Transmission and Dispatch Company Limited (Government of Pakistan). The project will be a 20yr BOOT. Gul Ahmed Wind Power Plant reached Financial Closure in April, 2015 and has an estimated cost of $135.3m USD, of which $33m USD will be financed through equity and $102.3m USD will be financed through debt. Equity will be provide by Gul Ahmed Energy Limited ($41.15m USD), InfraCo ($38.85m USD), and the IFC ($6.6 USD). Debt will be provided by the National Bank of Pakistan ($22.34m USD), the United Bank Limited of Pakistan ($22.34m USD), Alfalah Bank ($11.18m USD), Proparco ($20.64m USD), FMO ($13.73m USD), and the IFC ($12.08m USD). Gul Ahmed Wind Power Plant is expected to started production in December, 2016. Update details of PPA Check status of plant end of 2016 to makes it is online Sources: IJ Global: https://ijglobal.com/data/project/32995/50mw-gul-ahmed-wind-power-project Gul Ahmed Wind Power website: http://www.gaenergy.com/gawind/?page_id=9 NTDC website: http://www.ntdc.com.pk/DeptNewsEvents.php IFC: http://ifcext.ifc.org/IFCExt/spiwebsite1.nsf/0/102497A75E1A99FD85257D8E005BDF99

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data