logo

Gul Ahmed Wind Power Plant

Sector: Power Generation (CCGT) • Location: Pakistan

Source: World Bank Group

Project
Active

Gul Ahmed Wind Power Plant is a 50MW wind power facility run by Gul Ahmed Wind Power Limited, a subsidiary of Gul Ahmed Energy of the Gul Ahmed Group. The project is located about 100km away from the ocean in the middle of the desert in Sindh Province, Pakistan near Jhampir.

Gul Ahmed Wind Power Limited is a SPV sponsored by Gul Ahmed Energy Limited (41.15%), InfraCo Asia (38.85%), and the Intern

Status
Prospective
Sector
Power Generation (CCGT), Wind, Government, Commercial
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Gul Ahmed Wind Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Gul Ahmed Wind Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Gul Ahmed Wind Power Plant is a 50MW wind power facility run by Gul Ahmed Wind Power Limited, a subsidiary of Gul Ahmed Energy of the Gul Ahmed Group. The project is located about 100km away from the ocean in the middle of the desert in Sindh Province, Pakistan near Jhampir. Gul Ahmed Wind Power Limited is a SPV sponsored by Gul Ahmed Energy Limited (41.15%), InfraCo Asia (38.85%), and the International Finance Corporation (20%). Gul Ahmed Wind Power Limited signed a PPA with the National Transmission and Dispatch Company Limited (Government of Pakistan). The project will be a 20yr BOOT. Gul Ahmed Wind Power Plant reached Financial Closure in April, 2015 and has an estimated cost of $135.3m USD, of which $33m USD will be financed through equity and $102.3m USD will be financed through debt. Equity will be provide by Gul Ahmed Energy Limited ($41.15m USD), InfraCo ($38.85m USD), and the IFC ($6.6 USD). Debt will be provided by the National Bank of Pakistan ($22.34m USD), the United Bank Limited of Pakistan ($22.34m USD), Alfalah Bank ($11.18m USD), Proparco ($20.64m USD), FMO ($13.73m USD), and the IFC ($12.08m USD). Gul Ahmed Wind Power Plant is expected to started production in December, 2016. Update details of PPA Check status of plant end of 2016 to makes it is online Sources: IJ Global: https://ijglobal.com/data/project/32995/50mw-gul-ahmed-wind-power-project Gul Ahmed Wind Power website: http://www.gaenergy.com/gawind/?page_id=9 NTDC website: http://www.ntdc.com.pk/DeptNewsEvents.php IFC: http://ifcext.ifc.org/IFCExt/spiwebsite1.nsf/0/102497A75E1A99FD85257D8E005BDF99

Original sector

Energy

Budget

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Wind, Government, Commercial

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project