logo

Gulf Coast MS Main Street Revitalization

Sector: Government • Location: Biloxi, Mississippi, United States of America

Source: Dodge USA

Project
Closed

17 light fixtures and 16 daisy chain cords are to be installed on the east and west edge of the bridge between the columns on the south and north sides of Howard Avenue. (Please note that is a total of 34 fixtures and 32 daisy chain cords) 8 Light fixtures are to be installed on the north and south sides of the 8 bridge support columns on each side of Howard Avenue. The project includes installing

Status
Closed
Sector
Government, Bridge, Commercial, Power Generation (CCGT), Road
Location
Biloxi, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Gulf Coast MS Main Street Revitalization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Gulf Coast MS Main Street Revitalization” is an infrastructure initiative in the Government sector, located in Biloxi, Mississippi, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

17 light fixtures and 16 daisy chain cords are to be installed on the east and west edge of the bridge between the columns on the south and north sides of Howard Avenue. (Please note that is a total of 34 fixtures and 32 daisy chain cords) 8 Light fixtures are to be installed on the north and south sides of the 8 bridge support columns on each side of Howard Avenue. The project includes installing the necessary power supply as well as all wiring and conduit required.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Biloxi

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Bridge, Commercial, Power Generation (CCGT), Road

Article published date

2024-12-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project