Gulf Intracoastal Waterway Pipeline Dredging
Sector: Water Supply and Storage • Location: Port Lavaca, Texas, United States of America
Source: Dodge USA
: The work consists of Schedule No. 1 and two Options. Schedule 1 work includes GIWW maintenance pipeline dredging. Estimated dredge volume of 1,600,000 cubic yards (CY). Placement areas are open water PAs 122-125 and Aransas National Wildlife Refuge Beneficial Use Sites A and B. Completion time is 154 Calendar days. Option 1 work includes GIWW maintenance pipeline dredging. Estimated dredge volum
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Seaport
- Location
- Port Lavaca, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Gulf Intracoastal Waterway Pipeline Dredging
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | : The work consists of Schedule No. 1 and two Options. Schedule 1 work includes GIWW maintenance pipeline dredging. Estimated dredge volume of 1,600,000 cubic yards (CY). Placement areas are open water PAs 122-125 and Aransas National Wildlife Refuge Beneficial Use Sites A and B. Completion time is 154 Calendar days. Option 1 work includes GIWW maintenance pipeline dredging. Estimated dredge volume of 126,000 cubic yards (CY). Placement area for Option 1 is upland confined PA 119C. If awarded... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Port Lavaca |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Seaport |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
