Gulf of Suez Wind II
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
The EBRD is considering providing a loan for the expansion of the Red Sea Wind Energy (RSWE) 500 MW wind power plant (WPP) for which EBRD has provided finance (under Project ID 51509) and is currently under construction in the Gulf of Suez. The WPP will be extended by 150MW. 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan 3. Draft Environmental and Social Action Plan (ESAP) 4. ESIA
- Status
- Under Construction
- Sector
- Geothermal, Power Generation (CCGT), Wind, Warehouse, Water Supply and Storage, Raw Materials, Commercial, Residential
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Gulf of Suez Wind II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The EBRD is considering providing a loan for the expansion of the Red Sea Wind Energy (RSWE) 500 MW wind power plant (WPP) for which EBRD has provided finance (under Project ID 51509) and is currently under construction in the Gulf of Suez. The WPP will be extended by 150MW. 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan 3. Draft Environmental and Social Action Plan (ESAP) 4. ESIA for the BOO Wind Power Plant 500MW at the Gulf of Suez 5. ESIA for the 220kV Overhead Transmission Line (OHTL) for the RSWE 500 MW Wind Farm Project 6. Red Sea Wind Energy 500 MW Project: Critical Habitat Assessment 7. Red Sea Wind Energy 500 MW Project: Cumulative Effects Analysis 8. Red Sea Wind Energy 500 MW Project: Environmental and Social Management System Manual Download package in in Zip format: Arabic | English CEA: English | Arabic Updated Layout November 2022 Updated ESIA for the BOO Wind Power Plant 500MW at the Gulf of Suez (Nov 2022): English | Arabic Final ESAP: English | Arabic Updated Non-Technical Summary (NTS): English | Arabic Updated Environmental and Social Management System Manual: English | Arabic The Strategic Environmental and Social Assessment (SESA) conducted by Lahmeyer/Ecoda on behalf of RCREEE Red Sea Wind Energy (RSWE) 500 MW + 150 MW extension (650MW) Wind Power Plant (WPP): 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan (SEP) 3. ESIA for the RSWE WPP 500MW + 150 MW extension at the Gulf of Suez 4. RSWE WPP 500MW + 150 MW extension: Critical Habitat Assessment 5. RSWE WPP 500MW + 150 MW extension: Cumulative Effects Analysis The ESAP, ESMS manual and ESIA for the OHTL remain unchanged. Download package in in Zip format: Arabic | English Full ESIA documentation is available locally at: Environmental or social enquiries Contact Name: Reem Elbeltagy Email: reem.elbeltagy@redseawindenergy.com Web: http://www.rswe.co General enquiries Contact Name: Hans Bruins Email: hans.bruins@redseawindenergy.com Web: http://www.rswe.co |
Original sector | Energy |
Budget |
Location
Country | Egypt |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT), Wind, Warehouse, Water Supply and Storage, Raw Materials, Commercial, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in Egypt
- Kom Ombo Solar PV Plant Egypt
- South Helwan Supercritical Power Plant Egypt
- Lagia Oil Field Phase 2 Development Project, Sinai Peninsula
- Small scale thermal solar district units for Mediterranean communities
- Mobilizing new Areas of Investments And Together Aiming to increase Quality of life for All
- Suez Wind Energy BOO Wind Power Plant 1.1. GW
- Egypt - Cairo West Power
- Egypt - Shoubrah El Kheima Interconnexion Transmission System
