logo

Gulf of Suez Wind II

Sector: Water Supply and Storage • Location: Egypt

Source: European Bank for Reconstruction and Development (EBRD)

Project
Disbursing

The EBRD is considering providing a loan for the expansion of the Red Sea Wind Energy (RSWE) 500 MW wind power plant (WPP) for which EBRD has provided finance (under Project ID 51509) and is currently under construction in the Gulf of Suez.  The WPP will be extended by 150MW. 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan 3. Draft Environmental and Social Action Plan (ESAP) 4. ESIA

Project Information FAQ

Project Information

5 Q
The project “Gulf of Suez Wind II” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

disbursing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The EBRD is considering providing a loan for the expansion of the Red Sea Wind Energy (RSWE) 500 MW wind power plant (WPP) for which EBRD has provided finance (under Project ID 51509) and is currently under construction in the Gulf of Suez.  The WPP will be extended by 150MW. 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan 3. Draft Environmental and Social Action Plan (ESAP) 4. ESIA for the BOO Wind Power Plant 500MW at the Gulf of Suez 5. ESIA for the 220kV Overhead Transmission Line (OHTL) for the RSWE 500 MW Wind Farm Project 6. Red Sea Wind Energy 500 MW Project: Critical Habitat Assessment 7. Red Sea Wind Energy 500 MW Project: Cumulative Effects Analysis 8. Red Sea Wind Energy 500 MW Project: Environmental and Social Management System Manual Download package in in Zip format: Arabic | English CEA: English | Arabic Updated Layout November 2022 Updated ESIA for the BOO Wind Power Plant 500MW at the Gulf of Suez (Nov 2022): English | Arabic Final ESAP: English | Arabic Updated Non-Technical Summary (NTS): English | Arabic Updated Environmental and Social Management System Manual: English | Arabic The Strategic Environmental and Social Assessment (SESA) conducted by Lahmeyer/Ecoda on behalf of RCREEE Red Sea Wind Energy (RSWE) 500 MW + 150 MW extension (650MW) Wind Power Plant (WPP): 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan (SEP) 3. ESIA for the RSWE WPP 500MW + 150 MW extension at the Gulf of Suez 4. RSWE WPP 500MW + 150 MW extension: Critical Habitat Assessment 5. RSWE WPP 500MW + 150 MW extension: Cumulative Effects Analysis The ESAP, ESMS manual and ESIA for the OHTL remain unchanged. Download package in in Zip format: Arabic | English Full ESIA documentation is available locally at: Environmental or social enquiries Contact Name:  Reem Elbeltagy Email:  reem.elbeltagy@redseawindenergy.com Web: http://www.rswe.co General enquiries Contact Name:  Hans Bruins Email:  hans.bruins@redseawindenergy.com Web: http://www.rswe.co

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data