Gulf of Suez Wind II
Sector: Water Supply and Storage • Location: Egypt
Source: European Bank for Reconstruction and Development (EBRD)
The EBRD is considering providing a loan for the expansion of the Red Sea Wind Energy (RSWE) 500 MW wind power plant (WPP) for which EBRD has provided finance (under Project ID 51509) and is currently under construction in the Gulf of Suez. The WPP will be extended by 150MW. 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan 3. Draft Environmental and Social Action Plan (ESAP) 4. ESIA
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | disbursing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The EBRD is considering providing a loan for the expansion of the Red Sea Wind Energy (RSWE) 500 MW wind power plant (WPP) for which EBRD has provided finance (under Project ID 51509) and is currently under construction in the Gulf of Suez. The WPP will be extended by 150MW. 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan 3. Draft Environmental and Social Action Plan (ESAP) 4. ESIA for the BOO Wind Power Plant 500MW at the Gulf of Suez 5. ESIA for the 220kV Overhead Transmission Line (OHTL) for the RSWE 500 MW Wind Farm Project 6. Red Sea Wind Energy 500 MW Project: Critical Habitat Assessment 7. Red Sea Wind Energy 500 MW Project: Cumulative Effects Analysis 8. Red Sea Wind Energy 500 MW Project: Environmental and Social Management System Manual Download package in in Zip format: Arabic | English CEA: English | Arabic Updated Layout November 2022 Updated ESIA for the BOO Wind Power Plant 500MW at the Gulf of Suez (Nov 2022): English | Arabic Final ESAP: English | Arabic Updated Non-Technical Summary (NTS): English | Arabic Updated Environmental and Social Management System Manual: English | Arabic The Strategic Environmental and Social Assessment (SESA) conducted by Lahmeyer/Ecoda on behalf of RCREEE Red Sea Wind Energy (RSWE) 500 MW + 150 MW extension (650MW) Wind Power Plant (WPP): 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan (SEP) 3. ESIA for the RSWE WPP 500MW + 150 MW extension at the Gulf of Suez 4. RSWE WPP 500MW + 150 MW extension: Critical Habitat Assessment 5. RSWE WPP 500MW + 150 MW extension: Cumulative Effects Analysis The ESAP, ESMS manual and ESIA for the OHTL remain unchanged. Download package in in Zip format: Arabic | English Full ESIA documentation is available locally at: Environmental or social enquiries Contact Name: Reem Elbeltagy Email: reem.elbeltagy@redseawindenergy.com Web: http://www.rswe.co General enquiries Contact Name: Hans Bruins Email: hans.bruins@redseawindenergy.com Web: http://www.rswe.co |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
