logo
ProjectNot Active

Gulf Power Limited

Sector: Commercial • Location: Kenya

Source: Multilateral Investment Guarentee Agency (MIGA)

Project Description On June 16, 2014, MIGA issued a guarantee of €20.6 million ($27.9 million equivalent) covering a non-shareholder loan from Standard Bank of South Africa to Gulf Power Limited in Kenya. MIGA's coverage is for a period of up to 20 years against the risk of war and civil disturbance.[1]  Gulf Power Limited is developing an 80-megawatt heavy fuel oil diesel power plant, includin

Status
Closed
Sector
Commercial, Geothermal, Hydro, Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Kenya
Updated
22 Jul 2026
Source
Multilateral Investment Guarentee Agency (MIGA)

ConstructChat

Ask ConstructChat about Gulf Power Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Gulf Power Limited” is an infrastructure initiative in the Commercial sector, located in Kenya. Taiyo aggregates data on it from Multilateral Investment Guarentee Agency (MIGA).

Participants

Sponsoring Agency

Status

Original status

not active

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Description On June 16, 2014, MIGA issued a guarantee of €20.6 million ($27.9 million equivalent) covering a non-shareholder loan from Standard Bank of South Africa to Gulf Power Limited in Kenya. MIGA's coverage is for a period of up to 20 years against the risk of war and civil disturbance.[1]  Gulf Power Limited is developing an 80-megawatt heavy fuel oil diesel power plant, including a 66-kilovolt interconnector and backup-metering equipment, on a 20-year build-own-and-operate basis. The project will have a 20-year power purchase agreement with Kenya Power and Lighting Company (KPLC), the national transmission and distribution company. In 2009, KPLC invited bids for the design, financing, supply, erection, commissioning, operation, and maintenance of three new 60 to 80-megawatt medium-speed diesel electricity generating plants. The plants are to be located in the Athi River region, approximately 20 kilometers from Nairobi. Gulf Energy Limited won the bid to build one power station. The International Finance Corporation is providing financing for Gulf Power Limited and the project is further supported by a partial risk guarantee from the International Development Association. The World Bank's Africa Infrastructure Country Diagnostic found that the lack of adequate, reliable electricity supply is Kenya's largest infrastructure challenge and a key constraint to economic growth (contributing to economic losses of an estimated 2 percent of GDP). The project will help Kenya achieve a more diversified energy mix and stability to its power generation. The country remains heavily dependent on hydropower, which is frequently negatively impacted by drought. Installed thermal capacity provides a less expensive alternative to investments in emergency diesel-fired plants. MIGA's guarantee is aligned with the Agency's strategy of supporting investments in countries eligible for lending from the International Development Association, investments in complex projects, and South-South investments. [1] The guarantee was cancelled on December 24, 2020.

Original sector

Power

Budget

Location

Country

Kenya

Source

Source reliability

High

Source

Multilateral Investment Guarentee Agency (MIGA)

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Hydro, Oil and Gas, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2023-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project