Gulf Power Ltd
Completed · Kenya
Source: International Finance Corporation (IFC)
The project is the development of a greenfield 80 MW Heavy Fuel Oil (“HFO”) fired power plant, including a 66kv interconnector and backup metering equipment on a 20 years build-own-and-operate basis along the Nairobi –Mombasa highway in the Athi River area of Mavoko Municipality, Kenya (the “Project”). The Project will have a 20 year Power Purchase Agreement (“PPA”) with Kenya Power and Lighting C
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Power Generation (CCGT), Geothermal, Hydro, Road, Manufacturing (Industrial), Oil and Gas, Residential, Commercial, Government
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Gulf Power Ltd
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is the development of a greenfield 80 MW Heavy Fuel Oil (“HFO”) fired power plant, including a 66kv interconnector and backup metering equipment on a 20 years build-own-and-operate basis along the Nairobi –Mombasa highway in the Athi River area of Mavoko Municipality, Kenya (the “Project”). The Project will have a 20 year Power Purchase Agreement (“PPA”) with Kenya Power and Lighting Company (“KPLC”), the national transmission and distribution company. The PPA may be extended for 5 years based on mutual agreement between the Company and KPLC.The developer of the Project is Gulf Power Limited (“GPL” or the “Company”), a special purpose company incorporated in Kenya by a consortium of Kenyan investors with a view to enter the power generation business in Kenya. The Project is one of 3 Independent Power Projects (“IPPs”) for which KPLC had sought Expressions of Interests (“EOI”), in June 2009. These IPPs were expected to generate 60-80 MW each using medium speed diesel engines with HFO as the fuel. The projects were awarded through a competitive bidding process based on the lowest electricity charges. GPL submitted an EOI to bid for the Project. In the final bidding held on December 15, 2009, GPL was the lowest bidder for the development of an 80 MW plant on the Mombasa Road, Athi River Site and on that basis was awarded the concession. |
Original sector | AC - Heavy Fuel Oil - Thermal Power Generation |
Location
Country | Kenya |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Power Generation (CCGT), Geothermal, Hydro, Road, Manufacturing (Industrial), Oil and Gas, Residential, Commercial, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Kenya
- Acquisition of equipment and Facilities for expansion of hospitality project
- LAKE CHALLA INTEGRATED WATER RESOURCE DEVELOPMENT PROJECT
- DEVELOPMENT OF LOWER TURKWEL IRRIGATION PROJECT UNDER SUGARCANE PRODUCTION
- M-SAFI WASTE EXPERTS
- Ewaso Ng'iro Tannery and Leather Factory
- Oserian Two Lakes Industrial Park
- Bamboo Commercialization
- Tea Factory