logo

Gullen Range Wind Farm Field Study

Sector: Power Generation (CCGT) • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

Goldwind successfully installed and tested the Inertia-Based Fast Frequency Response (IBFFR) on 10 wind turbines at Gullen Range Wind Farm in NSW, supported by the wind farm’s owner BJCE Australia. Goldwind’s IBFFR technology had never been tested before in Australia. This field study provided a good opportunity to explore the technology’s capability.Goldwind conducted a testing plan to investigat

Project Information FAQ

Project Information

5 Q
The project “Gullen Range Wind Farm Field Study” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Goldwind successfully installed and tested the Inertia-Based Fast Frequency Response (IBFFR) on 10 wind turbines at Gullen Range Wind Farm in NSW, supported by the wind farm’s owner BJCE Australia. Goldwind’s IBFFR technology had never been tested before in Australia. This field study provided a good opportunity to explore the technology’s capability.Goldwind conducted a testing plan to investigate key parameters including response time, ramp rate, amplitude of response, duration of response and recovery period (magnitude and duration). Goldwind also investigated techniques to stagger the response of the wind turbines to provide a longer and smoother power boost.Additionally, the Australian Energy Market Commission (AEMC) introduced a rule change in March 2020 to mandate the provision of Primary Frequency Response from all synchronous and non-synchronous generators in the NEM. Goldwind’s IBFFR may provide a low cost means for wind farms to achieve this requirement.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data