Gullen Range Wind Farm Field Study
Sector: Power Generation (CCGT) • Location: Australia
Source: Australian Renewable Energy Agency (ARENA)
Goldwind successfully installed and tested the Inertia-Based Fast Frequency Response (IBFFR) on 10 wind turbines at Gullen Range Wind Farm in NSW, supported by the wind farm’s owner BJCE Australia. Goldwind’s IBFFR technology had never been tested before in Australia. This field study provided a good opportunity to explore the technology’s capability.Goldwind conducted a testing plan to investigat
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Goldwind successfully installed and tested the Inertia-Based Fast Frequency Response (IBFFR) on 10 wind turbines at Gullen Range Wind Farm in NSW, supported by the wind farm’s owner BJCE Australia. Goldwind’s IBFFR technology had never been tested before in Australia. This field study provided a good opportunity to explore the technology’s capability.Goldwind conducted a testing plan to investigate key parameters including response time, ramp rate, amplitude of response, duration of response and recovery period (magnitude and duration). Goldwind also investigated techniques to stagger the response of the wind turbines to provide a longer and smoother power boost.Additionally, the Australian Energy Market Commission (AEMC) introduced a rule change in March 2020 to mandate the provision of Primary Frequency Response from all synchronous and non-synchronous generators in the NEM. Goldwind’s IBFFR may provide a low cost means for wind farms to achieve this requirement. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
