Gum Neck Elevated Tank and Booster Station - Contract 2
Sector: Water Supply and Storage • Location: Columbia, North Carolina, United States of America
Source: Dodge USA
The Project consists of the installation of a new, factory-built package booster pump station to serve the elevated tank that is being constructed as a part of Contract 1 of the Gum Neck Elevated Tank and Booster Pump Station project. In general, the work will consist of the construction of the booster pump station, site work, piping, and electrical systems. Included in this contract is the instal
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Residential, Government, Commercial, Waste Processing and Treatment
- Location
- Columbia, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Gum Neck Elevated Tank and Booster Station - Contract 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the installation of a new, factory-built package booster pump station to serve the elevated tank that is being constructed as a part of Contract 1 of the Gum Neck Elevated Tank and Booster Pump Station project. In general, the work will consist of the construction of the booster pump station, site work, piping, and electrical systems. Included in this contract is the installation of PRV at the meter box of 15 existing residential services, located downstream of the new... |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Columbia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Residential, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
