Guna - Biaora section of NH - 3
Sector: Commercial • Location: Madhya Pradesh, India
Source: World Bank Group
The project under construction aims at four laning of the existing two lane road on the stretch Guna- Biaora on National Highway – 3 (NH-3), which has a total length of 93.5 km in the state of Madhya Pradesh. Jalpa Devi Tollways Limited is the project company, incorporated and wholly - owned by Dilip Buildcon Ltd. (DBL).
Project company has entered into a 26-year Concession Agreement with Nation
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project under construction aims at four laning of the existing two lane road on the stretch Guna- Biaora on National Highway – 3 (NH-3), which has a total length of 93.5 km in the state of Madhya Pradesh. Jalpa Devi Tollways Limited is the project company, incorporated and wholly - owned by Dilip Buildcon Ltd. (DBL). Project company has entered into a 26-year Concession Agreement with National Highways Authority of India under a design-build finance-operate and transfer (DBFOT) modality on toll basis. Concession contract was awarded after a competitive bidding process with bid criteria being the lowest grant requested from NHAI. Financial closure/appointed date was achieved on September 7, 2016. Project cost has been reported at Rs. 1081.9 crore and is being funded by debt financing of Rs. 654 crore ($98.28 million), capital subsidy of Rs 27 crore ($4.06 million) and equity contribution of Rs. 400.9 ($60.25 million). The Scheduled Commercial Operations Date (SCOD) for the project is March 06, 2019. However, the project is progressing ahead of its schedule as reflected by execution of 48% of the EPC work as on March 31, 2017. https://global.factiva.com/pro/default.aspx?napc=S&_XFORMSTATE=AFB7MTp7MTA5OnsxOjAsMjoiRCIsMzowLDQ6MCw1OiJwcm9ial9hcHBsaWNhdGlvbl9wZGY6YXJjaGl2ZS9BRklPUkgyMDE3MDcwNDAwNDkxLzQ4LzM0MjQ5OS9DQVJFUlQwMNwDCzVlZDc0MDAwMHUifX19EQAAdwAAAA%3d%3d&sa_from=GL https://global.factiva.com/pro/default.aspx?napc=S&_XFORMSTATE=AFB7MTp7MTA5OnsxOjAsMjoiRCIsMzowLDQ6MCw1OiJwcm9ial9hcHBsaWNhdGlvbl9wZGY6YXJjaGl2ZS9BRklPUkgyMDE3MDcwNDAwNDkxLzQ4LzM0MjQ5OS9DQVJFUlQwMNwDCzVlZDc0MDAwMHUifX19EQAAdwAAAA%3d%3d&sa_from=GL |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |