logo

Guna - Biaora section of NH - 3

Sector: Road • Location: India

Source: World Bank Group

Project
Active

The project under construction aims at four laning of the existing two lane road on the stretch Guna- Biaora on National Highway – 3 (NH-3), which has a total length of 93.5 km in the state of Madhya Pradesh. Jalpa Devi Tollways Limited is the project company, incorporated and wholly - owned by Dilip Buildcon Ltd. (DBL).

Project company has entered into a 26-year Concession Agreement with Nation

Project Information FAQ

Project Information

5 Q
The project “Guna - Biaora section of NH - 3” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project under construction aims at four laning of the existing two lane road on the stretch Guna- Biaora on National Highway – 3 (NH-3), which has a total length of 93.5 km in the state of Madhya Pradesh. Jalpa Devi Tollways Limited is the project company, incorporated and wholly - owned by Dilip Buildcon Ltd. (DBL). Project company has entered into a 26-year Concession Agreement with National Highways Authority of India under a design-build finance-operate and transfer (DBFOT) modality on toll basis. Concession contract was awarded after a competitive bidding process with bid criteria being the lowest grant requested from NHAI. Financial closure/appointed date was achieved on September 7, 2016. Project cost has been reported at Rs. 1081.9 crore and is being funded by debt financing of Rs. 654 crore ($98.28 million), capital subsidy of Rs 27 crore ($4.06 million) and equity contribution of Rs. 400.9 ($60.25 million). The Scheduled Commercial Operations Date (SCOD) for the project is March 06, 2019. However, the project is progressing ahead of its schedule as reflected by execution of 48% of the EPC work as on March 31, 2017. https://global.factiva.com/pro/default.aspx?napc=S&_XFORMSTATE=AFB7MTp7MTA5OnsxOjAsMjoiRCIsMzowLDQ6MCw1OiJwcm9ial9hcHBsaWNhdGlvbl9wZGY6YXJjaGl2ZS9BRklPUkgyMDE3MDcwNDAwNDkxLzQ4LzM0MjQ5OS9DQVJFUlQwMNwDCzVlZDc0MDAwMHUifX19EQAAdwAAAA%3d%3d&sa_from=GL https://global.factiva.com/pro/default.aspx?napc=S&_XFORMSTATE=AFB7MTp7MTA5OnsxOjAsMjoiRCIsMzowLDQ6MCw1OiJwcm9ial9hcHBsaWNhdGlvbl9wZGY6YXJjaGl2ZS9BRklPUkgyMDE3MDcwNDAwNDkxLzQ4LzM0MjQ5OS9DQVJFUlQwMNwDCzVlZDc0MDAwMHUifX19EQAAdwAAAA%3d%3d&sa_from=GL

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data